Wilmslow Park Weir
key details
| Value | £79,140 |
|---|---|
| Status | complete |
| Category (CPV) | 90700000 |
| Deadline | 4 Nov 2024 |
| Contract start | 2 Dec 2024 |
| Contract end | 31 Mar 2025 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-184998de-450d-4cea-9bbc-e9b20aaa4f17 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Fishtek Consulting | £79,140 | 27 Nov 2024 | active |
description
Wilmslow Park Large Weir is located on the River Bollin, southeast of the town of Wilmslow in East Cheshire, at grid reference SJ8567881137.
The weir is a two-staged weir, approximately 11m wide and 4m high. The weir is over 140 years old and appears to have been constructed for abstraction of water into a mill on the left bank. The mill race is disused and has been closed off for some time. The weir is constructed in large stone masonry with two vertical drops.
Just downstream of Wilmslow Park Large Weir is a smaller weir (Wilmslow Park Weir) at grid reference SJ8531981224, which is approximately 4m wide and 1.5m high.
The land is owned by Bollin Valley Partnership who have established ecological enhancements at the site and therefore we will be working with the Chesire East Council and Bollin Valley Partnership to deliver the project.
The Park is managed by the Bollin Valley Partnership, a collection of landowners (including Cheshire East Council) and conservational organisations, who oversee the management of green infrastructure.
The Mersey is a recovering migratory salmonid catchment, whose improvements are acknowledged in the Salmon Five Point Approach. Historically the catchment had a very productive salmonid fishery, and its potential to support future UK salmon stocks is significant.
In 2004, APEM delivered the report 'A Strategy for The Establishment of Sustainable Populations of Migratory Fish', on behalf of The Environment Agency. This document reviewed habitat information covering the entire Bollin sub catchment and developed a strategy for the re-introduction of salmon to the River Bollin to allow the establishment of self-sustaining populations.
Working upstream from the Manchester Ship Canal, all the weirs identified in the strategy up to Wilmslow Park Weir have either been removed or had a fish pass installed. Therefore, Wilmslow Park Weir is the current upstream limit for salmon on the River Bollin.
The aim is to complete surveys, appraisal and design updates (as appropriate) to deliver detailed design of weir removal for Wilmslow Park Weir and weir removal, weir modification or bypass for Wilmslow Park Large Weir. It is expected that this will be completed in two phases; Phase 1: Option Development and Phase 2: Detailed Design,
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 12 Dec 2024 | Award (award) | · | 47400fbe-c35c-431d-933a-81e1f4ab3bef-810329 |
more from Environment Agency
- Stanground 2025 · £52,235 · 11 Sept 2026
- Brentingby Penstock Spindles Replacement · £77,230 · 11 Sept 2026
- STON001 - Stony Stratford Sluice Platform and Stilling Well · £95,483 · 9 Sept 2026
- YOR - CDF - Keighley & Stockbridge OBC to FBC - ECC Contract · £96,442 · 9 Sept 2026
- AOMR Lot 2 -WMD Asset Recondition Programme 26/27 tender · £309,732 · 8 Sept 2026
- SWWM CCTV and Culvert Inspections 26_27 · £114,369 · 8 Sept 2026
- Harrimans Drive to M1 · £165,115 · 7 Sept 2026
- Forge Mill 2 · £141,827 · 7 Sept 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PRJ_31125 - SWAN Heating & Cooling Offer - Initial Techno, Economic and Planning Perspective Feasibility Study Created · Westminster City Council · £59,600
- The Provision of Ecology Services · Loughborough University
- Provision of Wastewater Quality Testing Service · Armagh, Banbridge & Craigavon Borough Council
- Biodiversity Net Gain (BNG) · NORTHUMBRIAN WATER LIMITED · £5,700,000
- SAMM (Strategic Access Management & Monitoring) for the Wealden Heaths Phase II Special Protection Area (SPA) · East Hampshire District Council · £432,000
- Production of seabird flight height distributions from at-sea laser rangefinder data · JNCC SUPPORT CO · £28,000
- Natural Capital Baselining on Glenlivet Estate · Crown Estate Scotland · £472,143
- Strategic Flood Risk Assessment and Water Cycle Study · Borough Council of Kings Lynn and West Norfolk
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.