Bournbrook Residences External Improvements
The value below is a framework or dynamic market ceiling: the maximum
that could be spent across all call-offs, not the value of a single contract.
Aggregate figures on this site exclude these to avoid double counting.
key details
| Value | £396,210 |
|---|---|
| Status | complete |
| Category (CPV) | 45000000 |
| Deadline | 12 Oct 2020 |
| Contract start | 19 Oct 2020 |
| Contract end | 28 Jan 2021 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-1784edcd-4ce1-4207-a9dc-52bc8103177e |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| GTH CONSTRUCTION LIMITED | £396,210 | 11 Oct 2020 | active |
description
| • | Erect scaffold to front elevation where required. |
| • | Take delivery of mewp and scissor lift for rear elevation. |
| • | Strip all cladding as required in order to expose all areas of fire barriers in positions indicated on the elevation drawings. Store on site |
| • | Cut vertical rails to assist removal of fire barriers and insulation. |
| • | Remove old fire barriers |
| • | Cut out insulation above and below old fire barriers. |
| • | Fit 2no "L" brackets to vertical rails (one above cut and one below cut). |
| • | Install AIM galvanised fixing clip & screw as per manufacturers specification. |
| • | Install 75mm (60mins) AIM Fire Cavity Barrier to manufacturers specification. Barriers to be installed to window header, jamb and sill to form continuous fire barrier around window opening and intumescent mastic used to close any gaps. Barrier to fully fill cavity and fit tightly to the inside face of the panel. Allow 5% compression in the barrier when installing to ensure a tight fit to panel. |
| • | Barrier to be fitted between existing vertical rails and helping hand brackets as required. Rails to be cut/altered as required to allow correct fitting of the barrier. Barrier sections must be butted tightly together on all sides and intumescent mastic used to close any gaps. |
| • | Install 75mm (60mins) AIM Fire Cavity Barrier to manufacturers specification to horizontal and vertical party wall/floor lines. Barrier to fully fill cavity and fit tightly to the inside face of the panel. Allow 5% compression in the barrier when installing to ensure a tight fit to panel. |
| • | Barrier to be fitted between existing vertical rails and helping hand brackets as required. Rails to be cut/altered as required to allow correct fitting of the barrier. Barrier sections must be butted tightly together on all sides and intumescent mastic used to close any gaps. |
| • | Reinstall Trespa panels or fit new (as required) to existing rails where possible. New panels to be like for like replacements. Where not possible fit panels using TS700 visible fixings (powder coated to RAL TBC). Fixings fitted to new Z rail. Rail to be clear of barrier. |
| • | Fit new 200mm foil faced insulation above fire barrier to replace old insulation, and tape all joints (not over fire barrier as previous install). |
| • | Install fire barrier around 27no duct vents. |
| • | Carefully reinstate all cladding to elevations. |
| • | Clear site away including all old insulation and fire barriers. |
| • | Site compound area to be located in rear service yard. |
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 25 Oct 2021 | Award (award) | · | baacc2cb-a26c-4c07-a88c-92c13f42d4c3-479412 |
more from THE UNIVERSITY OF BIRMINGHAM
- Aston Webb Student Precinct - West Phase - QS & PD · £467,559 · 19 Feb 2025
- Life + Health Sciences Cluster - QS & PD · £504,792 · 19 Feb 2025
- HWB NMR - Main Contractor · £718,832 · 19 Feb 2025
- Aston Webb Student Precinct - West Phase - M&E · £944,642 · 19 Feb 2025
- Life + Health Sciences Cluster - M&E · £1,143,785 · 19 Feb 2025
- Provision of Technical Services at The High Temperature Research Centre (HTRC) · £3,280,000 · 19 Feb 2025
- Life + Health Sciences Cluster - Multi D · £3,293,460 · 19 Feb 2025
- IBR Chiller Replacement - M&E · £63,600 · 20 Jan 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PLACE1266H MHA PSP4 Agency Staff - S278 Street Lighting Support Scheme (2026 2027) · Derbyshire County Council · £80,000
- ENQ1310 - 2026-27 Structures Programme Assistance · DERBY CITY COUNCIL · £25,000
- CPU 7199 - Newstead Abbey MEND repair programme Quantity Surveyor · Nottingham City Council · £38,665
- CPU 7275 - Newstead Abbey MEND Repair Programme Conservation Accredited Lead Advisor · Nottingham City Council · £68,996
- Tickford Park Primary School SEND Unit · Milton Keynes Council · £101,188
- Cleeve and Yatton Small Transport Hubs · North Somerset Council · £116,495
- Lowca Community School - Damp remediation works · Cumberland Council · £47,080
- L9-102 ATE Monument Roundabout · North Lincolnshire Council · £198,564
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.