gvtcx

Gilmour Section House Net Zero Phase 2 - Pipework Adaptions

METROPOLITAN POLICE SERVICE Published 12 Nov 2025 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£452,472
Statuscomplete
Category (CPV) 45000000
RegionLondon
Deadline21 Oct 2025
Contract start22 Oct 2025
Contract end12 Jun 2026
Procedureselective
SME suitableYes
OCIDocds-b5fd17-08752a64-9c29-4f89-993f-aaec09a675ee

Award

SupplierValueDateStatus
Baxall Construction Limited £452,472 20 Oct 2025 active

description

Modify existing LTHW PHEs. Install ASHP circulating pumps and pipework with buffer vessels, pipework insulation, vertical distribution, leak detection, and immersion heater to one buffer vessel. Install LTHW circulating pumps and distribution insulated pipework with energy meters on primary and secondary side. Energy meter for cold water fill for PU. Hot water twin pump sets and secondary pump, boiler circulation pump, cold water supply and a complete pipework system installation in the basement. Heat pump accessories with trace heating for external pipework. Reroute vent pipe on roof from the ASHP enclosure. HWS secondary pump and pipework with semi-instantaneous DHW calorifiers with associated PHE, pumps and electric immersion heaters.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
12 Nov 2025 Award (award) · 385d8273-ce54-43fc-8c01-4d810556073a-871830

more from METROPOLITAN POLICE SERVICE

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.