Manfature of Explosives for Research Testing
key details
| Status | planning |
|---|---|
| Category (CPV) | 24610000 |
| Region | South West |
| SME suitable | Yes |
| OCID | ocds-b5fd17-1bf7b10e-3dfb-4af9-82e5-1d535533df8f |
description
The objective of this requirement is to manufacture explosives for research testing on a range of sizes and materials within bespoke geometries (typically without a casing). As these are for research characterisation or validation purposes, maximum care is required in terms of composition, quality control, consistency, mixing etc These tests include
| - | Initiation/SDT (Shock to detonation transition) testing |
| - | UNDEX (UNDerwater EXplosion) |
| - | Near-field testing (0.1<Z<1 m/kg1/3) |
| - | Far-field testing |
| - | Confined testing |
| - | General charge boosters |
Requirements are to manufacture explosives to MIL spec or equivalent, unless otherwise agreed with Dstl, to a range of criteria. Examples of which include:
| - | Materials: |
| o | TNT |
| o | PE6 |
| o | PBXN-109 |
| o | PBXN-111 |
| o | KS57 |
| o | LX17 |
| o | PBXN-5 |
| o | PBXN-110 |
| o | Propellants |
| o | Inert surrogates of explosives (e.g. PBXN-110 using sugar instead of HMX) |
| o | Research charges with requested composition (unique composition or change in particle size distribution etc) |
| - | Geometry: |
| o | Sphere |
| o | Hemisphere |
| o | Cylinder (various L/D) |
| o | Detonator or booster holes would likely be required |
| - | Casing |
| o | No casing (cast and then removed from moulds with minimum surface imperfections or machined after removal to ensure surface quality) |
| o | Plastic/polymer casings to allow visualisation of samples while being tested (e.g. temperature measurements during SDT testing) |
| o | Plastic/polymer casings to charge protection/separation from ambient conditions (e.g. for UNDEX charges) |
| o | Casing only, bespoke casings to be later filled (e.g. with nitromethane) |
| o | Metallic casings, various thickness of e.g. steel to either provide confinement or investigate fragmentation effects |
| o | Reactive metal casings, such as aluminium or magnesium to investigate combustion effects of the casings |
| - | Charge size |
| o | Small (e.g. <10g) up to large (e.g. 200kg) |
Additional information:
Information requested: To assist the Authority, respondents to this RFI should provide information to meet these above requirements, including but not limited to:
| - | A breakdown of what is and is not possible for a range of combinations |
| o | e.g. can manufacture up to 200kg within a casing but only to 5kg spheres or 3kg cylinders (with a certain L/D) if uncased |
| - | Manufacture capacity |
| - | Approximate lead times |
| - | Limitations of certain materials |
| - | Tolerances for small charges |
| - | Anticipated issues (e.g. voids or imperfections for small charges or when removing from moulds |
| - | Techniques for modifying initial charge conditions, such as |
| o | Damage - sub-critical impact to alter state |
| o | Compression to reduce voids/pores (eliminate micro-pores and leave only nano-pores) |
| o | Vacuum/inert atmosphere manufacture - ensure voids/pored no not contain air |
| - | Techniques for analysing charges once manufactures, such as: |
| o | Investigate pore size |
| o | Investigate particle size distribution |
| - | Safety data sheets etc for transport to test site (UK or international) |
| - | Small scale hazard testing facilities, for if unique compositions are chosen and need safety aspects before being manufactured or transported |
| - | Manufacturing and mixing facilities/instrumentation |
Your written responses should be submitted by email to dblackmore@dstl.gov.uk to arrive by not later than that date and time detailed above
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 12 Nov 2024 | Planning (planning) | · | 1d6b17a5-63b1-4552-854c-9514bb85c49d-801849 |
more from Ministry of Defence
- TTHC/0017 Torpedoes Repair and Maintenance (TRAM) · £405,762,737 · 29 Jul 2026
- 713107450 In Service Support of Type 45, Integrated Navigation and Bridge System Award notice · £9,888,089 · 28 Jul 2026
- SUPPLY CHAIN NOTICE - Calibration Services For Tooling Supporting Boeing, Vertical Lift Helicopters. · £12,000 · 28 Jul 2026
- SUPPLY CHAIN NOTICE - WC1996767 - (MT0019, MT0106, MT0265, MT0494) - Remedial works required to M&T Structures from the PAs, Akrotiri & Dhekelia, CYPRUS · 28 Jul 2026
- 715878489 - MCF 4 Order Form · £1,082,000 · 28 Jul 2026
- Provision of Foreign Currency SUpply to 2028 · £800,000,000 · 28 Jul 2026
- 704461451-MSS/141-SPA707 - CAN · £1 · 28 Jul 2026
- External Legal Support for FMSP Extensions · £450,000 · 27 Jul 2026
all contracts from this buyer →
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.