Framework Agreement for Mechanical and Associated Works 2023-2025 (2027) for works up to a value of £500,000

Wigan Council Published 21 Apr 2023 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£10,000,000
Statuscomplete
Category (CPV) 45331110 +8 more
RegionNorth West
Deadline20 Jan 2023
Procedureopen
OCIDocds-h6vhtk-038c20

Awards (18)

This procurement was awarded to 18 suppliers. Values shown are per-award; the notice total is £10,000,000.

SupplierValueDateStatus
CPL Heating and Plumbing Limited shared · · active
CPL Heating and Plumbing Ltd (Lot 1 and Lot 2) shared £0 16 Apr 2023 active
DFP Services Limited shared · · active
DFP Services Limited (Lot 1 and Lot 2) shared £0 16 Apr 2023 active
EE Thompson and Son Ltd (Thompson Building Services Engineers) shared · · active
EE Thompson and Son Ltd (Thompson Building Services Engineers) ( shared £0 16 Apr 2023 active
Hayman Mechanical Services Limited shared · · active
Hayman Mechanical Services Limited (Lot 1 and Lot 2) shared £0 16 Apr 2023 active
J.G. Kelley (Fleetwood) Limited T/A EAS Electrical & Mechani shared £0 16 Apr 2023 active
J.G. Kelley (Fleetwood) Limited T/A EAS Electrical & Mechanical Engineers shared · · active
Kimpton Ltd shared · · active
Kimpton Ltd (Lot 1 and Lot 2) shared £0 16 Apr 2023 active
Seddon Construction Limited shared · · active
Seddon Construction Limited (Lot 1 and Lot 2) shared £0 16 Apr 2023 active
Sure Maintenance Limited shared · · active
Sure Maintenance Limited (Lot 2) shared £0 16 Apr 2023 active
WH Good Limited shared · · active
WH Good Limited (Lot 1) shared £0 16 Apr 2023 active

description

Wigan Council is seeking to procure a panel of contractors to be part of a framework agreement for mechanical and associated works for works up to a value of £500,000 per project.

The scope of works within this framework is mechanical and associated works; this includes, but is not limited to:

  • Boiler replacement, alterations to heating systems, pump replacement and the like (requirements for these works will arise in Lot 1 and Lot 2).
  • Decarbonisation works including Air Source Heat Pumps (Lot 1 & 2), solar thermal / PV (Lot
  • 1& 2), Ground Source Heat Pumps (Lot 2), Biomass Boilers (Lot 2), and the like.

Bidders must be able to deliver both conventional Boiler/heating related type works and those Decarbonisation works within the scope of the relevant Lot (as detailed above) in respect of the value Lots to which they are applying.

The framework agreement will consist of 2 lots. Lot 1 will deliver works up to a value of £150,000 per project and Lot 2 will deliver works having a value of between £150,000 and £500,000 per project. All contractors appointed to the framework must be able to undertake projects to the upper project cost limit for the lot(s) to which they are applying.

Individual contracts raised under the framework agreement can commence at any time during the period of the framework.

The Framework Agreement will run for an initial period of 2 years and may be extended for two further periods of 12 months each.

It is intended to appoint between 5 and 10 contractors per Lot. These will be the top 5 to 10 highest scoring bidders provided there are sufficient compliant and satisfactory responses received under the tender process.

The framework agreement will be available for use by all directorates within Wigan Council and schools in the borough of Wigan. There will be potential for partner organisations and other areas of the Council to use the framework, as detailed within the Invitation to Tender documentation.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

5 notices published against this procurement.

PublishedTypeRegimeNotice
9 Dec 2022 Contract notice (F02) Earlier regulations 034878-2022
12 Dec 2022 Corrigendum (F14) Earlier regulations 035100-2022
9 Jan 2023 Corrigendum (F14) Earlier regulations 000555-2023
21 Apr 2023 Contract award notice (F03) Earlier regulations 011425-2023
21 Apr 2023 Award (award) · fca6b36e-568d-4479-ba5e-13fd7a36b262-638258

more from Wigan Council

all contracts from this buyer →

similar contracts awarded