BLD0323-02 03 Fire Strategies Phase 2 & 3

Ministry of Defence Published 19 Mar 2026 Contracts Finder

key details

Value£500,000
Statusplanned
Category (CPV) 71317100
RegionSouth East
Contract start3 Aug 2026
Contract end5 Jan 2028
SME suitableYes
OCIDocds-b5fd17-17653bce-c883-4097-9414-0ff389ed6c66

description

Building Inspection & production of FIRE STRATEGY' REPORTS in accordance with the following.

Building Regulations Part 'B' & all amendments. (This document is the primary document that PNB operates against)

Regulatory reform [fire safety] Order

COSHH Regulations.

The 'Fire Strategy' investigations and production of fire strategy reports shall be carried out by a 'competent person' who shall meet the relevant experience and qualifications to produce comprehensively the requirements of this SoR. The fire strategists shall be qualified as follows: -

Professional qualifications. Degree qualified and be Members or Fellow Members of the Institute of Fire Engineers

Minimum of 10 years' experience in the field of 'Fire Strategy' reporting based on existing buildings.

Have a working Knowledge of:-

Experience with IOSH Managing Safely. Carry NEBOSH National General Certificate. Carry HABC Level 2 award in fire safety. BAFE registered. ISO9001 Loss Prevention Certification Board (LPPC).Fire Industry Association (FIA).United Kingdom Accredited Service (UKAS).FIRAS Certification. TRADA.

The qualifications and verification of expertise and experience of proposed personnel shall be clearly defined as part of the tender procedure. Changes to the staff presented within the tender are only to be changed if agreed with the Project Manager at the time of the negotiations and contract awarded. It is important that the quality and relevant experience of team members is maintained throughout the contract until handover.

All fire strategies shall take account of the buildings as built and the associated standards that were applicable at the time of the design and construction of the buildings. Where age of building is not known then best practice will be observed taking account of the buildings use and escape routes available.

Where buildings have been modified the revised layouts shall be used to determine the appropriate strategy while keeping to the original intended proposals as far as is possible.

Occupancy levels shall be verified for each building.

The fire strategies developed will be for a mixture of complex and Non-Complex arrangements depending on the building type, use occupancy level etc. The successful Subcontractor shall review and determine the complexity of the buildings, agree with the client and KBS and develop the strategies around these decisions.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
19 Mar 2026 Planning (planning) · 8f200cc9-ee48-4887-8c90-8f05670ed0fc-889172

more from Ministry of Defence

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.