BATTERY ENERGY STORAGE INSTALLATION (BESS) - Multiple UK & Ireland Based

BIP SOLUTIONS LIMITED Published 7 Jan 2025 Contracts Finder

key details

Value£10,000,000
Statusactive
Category (CPV) 09330000 +7 more
Deadline24 Jan 2025
Contract start5 May 2025
Contract end7 Jan 2026
SME suitableYes
OCIDocds-b5fd17-e3ff282e-a4be-4140-88e9-9c1dc9e601ff

description

Fluence Energy (A Siemens and AES Company) have an exciting BoP EPC project pipeline for 2025. Fluence are working with some fantastic new and existing customers, helping them to deliver comprehensive turnkey Battery Energy Storage Solutions (BESS).

We are looking to contract with Balance of Plant (BoP) Civil and Electrical contractors to deliver an initial pipeline of 3 projects. All three projects are Turnkey and located within UK & Ireland. The Specific areas of these projects are in close proximity to: East Ayrshire (Scotland), Greater Manchester (England) and Dublin (Ireland).

Typical BoP scope activities includes (but not limited to):

Preliminaries:

Project & Site Management Design & Engineering Management Electrical System Studies Site Setup

Civil Works:

Enabling Works Setting out and surveys HSE, site infrastructure and CDM compliance Temporary works requirements Establish Finished platform Piling

Drainage works Ducting and troughing installation Installation of equipment bases Control Room Installation Equipment lifting Landscaping

Electrical Works:

Lightning Protection, earthing, bonding

Supply & install of switchboards

Supply & Install cables including terminations

Supply & Install Auxiliar Transformers

Supply & Install Containerised Building/Control Room/s Control & Protection Panels & Wiring

Supply & Install BESS External Lighting

Supply & Install BESS CCTV System (optional)

Supply & Install DC Systems (Containerised Building) (Optional)

Installation of Fire Alarm Panels (including wiring )

BESS - Offloading, Positioning & Installation of Battery Enclosures BESS - Cooling Liquid filling of Battery Enclosures

BESS - Offloading, Positioning & Installation of Power Conversion Systems BESS - Offloading, Positioning & Installation of Core Transformers BESS - Offloading, Positioning & Installation of Core Support Enclosures BESS - Offloading, Positioning & Installation of Core Auxiliary Power Panel BESS - Supply & Installation of Cables in all Battery Nodes BESS - Supply & Installation of Communication Cables

BESS - Supply & Installation of Auxiliary Power Cables BESS - Supply & Installation of All Cables from BESS PEC Unit to IPP Customer Control Building BESS - Supply & Installation of Auxiliary F-Stop Cables BESS - Supply & Installation of Fire Alarm System Cables

Test & Commissioning:

Test & Commissioning Containerised Building (Switchgear, LV AC & DC, Fire, C&P and FO Cables)

Quality Assurance Documentation

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
7 Jan 2025 Tender (tender) · d6402396-98f4-4039-8823-d26c73ea17be-815199
27 Nov 2025 Tender amendment (tenderAmendment) · d6402396-98f4-4039-8823-d26c73ea17be-873846

more from BIP SOLUTIONS LIMITED

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.