gvtcx

Update of Departures Manual

Highways England Published 26 Aug 2021 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£54,167
Statuscomplete
Category (CPV) 73000000
RegionSouth East
Deadline13 Aug 2021
Contract start26 Aug 2021
Contract end31 Mar 2022
Procedureselective
SME suitableYes
OCIDocds-b5fd17-16de4b95-3011-48e2-94ad-2ea0466e29b4

Award

SupplierValueDateStatus
WSP UK Ltd £54,167 24 Aug 2021 active

description

The departure from standards process is a key aspect of the 'added value' delivery of trunk road works and supports the technical governance aspects of the Road Investment Strategy. It provides:

  • a structured means of ensuring discharge of Highways England's legal and statutory responsibilities under health and safety, and highway legislation is maintained.
  • supporting evidence to drive improvements in highways construction and maintenance standards and guidance, locking in cost reductions

Departures from Standard are considered in circumstances where there is little practical alternative except at disproportionately high construction cost, whole life cost, delays, environmental impact, effect on programme, etc.

This project and Stage 1, 2, 3, 4a and 4b which preceded it are aligned with a suite of Projects which are undertaking the review of the DMRB, MCHW and the implementation of the Technical Standards Enterprise System (TSES).

more from Highways England

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.