gvtcx

Thames Tideway Tunnel - C405 Main Works West - Intertidal Terrace

key details

Value£1
Statuscomplete
Category (CPV) 45112700
RegionLondon
Deadline9 Dec 2020
Contract start11 Nov 2021
Contract end10 Feb 2022
SME suitableNo
OCIDocds-b5fd17-d046654b-068e-4522-8bcc-f43f8b55da23

Award

SupplierValueDateStatus
not named £128,500 8 Jun 2021 active

description

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.

The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.

The Project comprises:

  • a.tunnels:
  • i.a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
  • ii.11 connection tunnels, which will link flows from CSOs to the main tunnel.
  • b.Worksites:
  • i.five main tunnel Worksites (drive and/or reception sites)
  • ii.16 CSO Worksites
  • iii.two System modification Worksites Thames Tideway Tunnel
  • iv.works at Beckton Sewage Treatment works.

Section 4: Scope of Works

The Subcontract works include but are not limited to:

Building ground levels to the required depths in the intertidal area shown on the drawings and specification provided with this tender.
Plant specified planting mixes and conduct any required maintenance for a suitable period to establish the tidal area.
Maintenance to be conducted in accordance with document reference 6450-TWULD-DRMST-960-SZ-SP-000002.

The Subcontractor shall provide all required plant, equipment and labor to complete the works.

Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.

Quotations will be evaluated based on;

Cost

Timeliness of return

Adherence to and demonstration of understanding of the drawings and specifications provided at this point.

Provision of accurate product specifications to accompany the quotation.

Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.

Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)

BMB-JV Tideway West, Dormay Street, Wandsworth, SW18 1EY

Additional information: BMB-JV Tideway West, Dormay Street, Wandsworth, SW18 1EY

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
5 Jul 2021 Award (award) · cc2b012c-59a2-414c-b815-735823a879fc-446823

more from BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.