Delivery of Operational Safety Cases For HMNB Clyde
key details
| Value | £6,347,443 |
|---|---|
| Status | complete |
| Category (CPV) | 71300000 |
| Region | Scotland |
| Deadline | 10 Nov 2024 |
| Contract start | 12 Nov 2024 |
| Contract end | 31 Mar 2028 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-143c537c-8466-4639-beaa-41fd22d2b133 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Occam Group Limited | £6,347,443 | 11 Nov 2024 | active |
description
The Government White Paper published in December 2006 set out the United Kingdom (UK) Government's intention to retain a minimum assured independent strategic nuclear deterrent for the foreseeable future. This will be fulfilled by the Dreadnought SSBN as the replacement for the V-Class.
Operationally, the Dreadnought Nuclear Powered Warship (NPW) will provide the 'replacement' capability for the V-Class NPW rather than providing a 'new' capability. Consequently, the expected mission and functional requirements can be assumed to be essentially the same as those of the V-Class NPW. However, the reactor design in Dreadnought is Pressurised Water Reactor (PWR) 3 as opposed to PWR2 in V-Class - the change in design of the reactor and its associated systems means that Safety Justifications (SJs) for Dreadnought operations at HMNB(C) may place different requirements to V-Class.
Consequently, there is a requirement to establish, and maintain across the project timeframe, a suitably qualified and experienced technical team and deliver a suite of Operational Safety Cases (OSCs) for His Majesty's Naval Base (Clyde) (HMNB(C)) to Relevant Good Practice (RGP) and within the timescales imposed by the HMNB(C) Dreadnought Readiness Date.
The suite of OSCs will justify NPW activities undertaken at the HMNB(C) Authorised Site, initially to justify Dreadnought activities and enable HMNB(C) to meet the Dreadnought Readiness Date, and ultimately to update the OSCs to justify Astute and Vanguard Class activities so that the HMNB(C) safety cases for all NPW activities meet RGP.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 14 Nov 2024 | Award (award) | · | 04421729-8a5b-475f-8c37-6e86e05876fd-802431 |
more from Ministry of Defence
- TTHC/0017 Torpedoes Repair and Maintenance (TRAM) · £405,762,737 · 29 Jul 2026
- 713107450 In Service Support of Type 45, Integrated Navigation and Bridge System Award notice · £9,888,089 · 28 Jul 2026
- SUPPLY CHAIN NOTICE - Calibration Services For Tooling Supporting Boeing, Vertical Lift Helicopters. · £12,000 · 28 Jul 2026
- SUPPLY CHAIN NOTICE - WC1996767 - (MT0019, MT0106, MT0265, MT0494) - Remedial works required to M&T Structures from the PAs, Akrotiri & Dhekelia, CYPRUS · 28 Jul 2026
- 715878489 - MCF 4 Order Form · £1,082,000 · 28 Jul 2026
- Provision of Foreign Currency SUpply to 2028 · £800,000,000 · 28 Jul 2026
- 704461451-MSS/141-SPA707 - CAN · £1 · 28 Jul 2026
- External Legal Support for FMSP Extensions · £450,000 · 27 Jul 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- NW - AOMR - Lot 2 25-27 GMMC MEICA D&B Package · Environment Agency · £1,200,000
- Coastal Sensor Equipment & Engineering Support · Home Office · £5,000,000
- Owner's Engineer · GREAT BRITISH ENERGY - NUCLEAR · £600,000,000
- DNWP0023/LOT4/Waste OU - RCT Redundant Facilities Baseline · Sellafield · £221,435
- CM3842 Technical Services and Assurance Framework · YORKSHIRE WATER SERVICES LIMITED · £80,000,000
- 02-Procurement Strategy-AT-HC-2025 Cemetery Exten-02 · Reading Borough Council
- PCI_LotA_169 Whitehill Bordon: Station Road Crossroads & Adjacent Shared Use Path · HAMPSHIRE COUNTY COUNCIL · £59,716
- PCI_LotB4_186 Whitehill and Bordon Relief Road - Air Quality Monitoring 2025 · HAMPSHIRE COUNTY COUNCIL · £16,620
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.