ITT 4821 - 604077 - Area 7 - Street Lighting Value Management - Electrical Testing

Highways England Published 4 Sept 2019 Contracts Finder

key details

Value£60,000
Statusactive
Category (CPV) 45223200
RegionEast Midlands
Deadline13 Sept 2019
Contract start19 Sept 2019
Contract end3 Oct 2019
Procedurelimited
SME suitableYes
OCIDocds-b5fd17-c5017c25-83b8-4142-a1a7-1f47245afb04

description

The works to be provided under this contract are:

CategorySurvey Description
Vegetation ClearanceVegetation clearance to enable features to be accurately surveyed by other disciplines. This will be carried out under a different contract running concurrently. There may be a need for the contractor to carry out some localised vegetation clearance
Electrical TestingFull electrical test and condition reports for all assets from identified feeder pillars.
Column Structural TestingAll street lighting columns to be structurally tested by means of material thickness test.
Reverse Engineering EN40 calculationsFollowing the column structural testing the contractor shall carry out reverse engineering to determine the suitability for replacement lanterns.
Duct and Chamber SurveyTo determine the suitability of existing duct and draw pit chambers for use on future scheme upgrades.
Trial Holes or Slot trenches and WAC testingTrial holes to locate existing road crossings and coincide with the duct survey. Waste acceptance testing to ensure waste is catergorised for removal to landfill
Asbestos Survey and TestingSample test shall be carried out to determine if asbestos is present in existing materials
Pavement Investigation (Core samples)To identify cross sectional build up of the carriageway
1.3Deliverables
1.3.1The Contractor is required to produce the following deliverables:
(1)An appropriate individual to attend pre-commencement site inspection & client meeting.
(2)A method statement, programme of works, H&S plan including risk assessment, contractors offer signed, completed price list, completed form of tender and insurance documents for the survey shall be submitted.
(3)The contractor is to provide all the necessary plant equipment, materials and labour to carry out all surveys to enable features to be accurately surveyed. Additionally, the Contractor to liaise with Topographical survey contractor to ensure site clearance requirements for access are met to carry out street lighting column inspections and draw pit chamber inspections.
(4)The contractor to provide all the necessary plant, materials & labour to carry out all surveys on site for the timings as stated in section 3 and specification as stated in section 6.
(5)All reports including detailed drawings in CAD format, site photos as detailed in section 6 are to be submitted within 2 weeks of works being completed on site.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
4 Sept 2019 Tender (tender) · f3c05edf-e12c-432f-ae96-1caeb159cbd9-311920

more from Highways England

all contracts from this buyer →

similar contracts awarded