gvtcx

605377 - M5 J29-31 BD FHS

Highways England Published 9 Dec 2020 Contracts Finder

key details

Value£9,500
Statuscomplete
Category (CPV) 45232450
RegionSouth West
Deadline27 Nov 2020
Contract start14 Dec 2020
Contract end15 Jan 2021
Procedureopen
SME suitableYes
OCIDocds-b5fd17-bf729e2a-da59-47df-8d9b-5f792ce0e9c7

Award

SupplierValueDateStatus
Lanes Group £22,195 9 Dec 2020 active

description

"CCTV survey along the edge of the carriageway in the verge and central reservation between MP 260/4 and MP 261/7. Both Directions as shown on drawings in Section 2.1.2

Essential vegetation clearance as required to access and survey the drainage assets. Primarily a swath cut in areas indicated on drawings in Section 2.1.2

High pressure water jetting and root cutting techniques to be undertaken as required to eliminate blockages due to roots, lateral intrusions, debris etc and to facilitate full survey of the drainage assets

Due to the works being undertaken in a known dormice area all vegetation clearance, including roots and stalks from the areas identified, shall be carried out under ecological supervision as provided by the Employer.

Unnecessary disturbance of verge, ditches and other assets shall be avoided during the works

All reports and associated documentation to be handed to Client within 2 weeks of completion of works on site"

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
9 Dec 2020 Award (award) · 0d2aede8-45db-4b1e-808b-e2a1ad4500d6-399233

more from Highways England

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.