605377 - M5 J29-31 BD FHS
key details
| Value | £9,500 |
|---|---|
| Status | complete |
| Category (CPV) | 45232450 |
| Region | South West |
| Deadline | 27 Nov 2020 |
| Contract start | 14 Dec 2020 |
| Contract end | 15 Jan 2021 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-bf729e2a-da59-47df-8d9b-5f792ce0e9c7 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Lanes Group | £22,195 | 9 Dec 2020 | active |
description
"CCTV survey along the edge of the carriageway in the verge and central reservation between MP 260/4 and MP 261/7. Both Directions as shown on drawings in Section 2.1.2
Essential vegetation clearance as required to access and survey the drainage assets. Primarily a swath cut in areas indicated on drawings in Section 2.1.2
High pressure water jetting and root cutting techniques to be undertaken as required to eliminate blockages due to roots, lateral intrusions, debris etc and to facilitate full survey of the drainage assets
Due to the works being undertaken in a known dormice area all vegetation clearance, including roots and stalks from the areas identified, shall be carried out under ecological supervision as provided by the Employer.
Unnecessary disturbance of verge, ditches and other assets shall be avoided during the works
All reports and associated documentation to be handed to Client within 2 weeks of completion of works on site"
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 9 Dec 2020 | Award (award) | · | 0d2aede8-45db-4b1e-808b-e2a1ad4500d6-399233 |
more from Highways England
- Contract Awarded for Motorway Service Area Energy Storage Systems · £6,561,414 · 15 Feb 2023
- T0399 National Highways Sector Scheme Review · £74,373 · 13 Dec 2022
- Gantries for National Highways · £7,000 · 1 Dec 2022
- T0340 Update of Departures Manual · £39,115 · 25 Nov 2022
- TA SE&E 011 - M27 Junction 10 · £166,004 · 23 Nov 2022
- National Highways Tree/Nurseries Market Engagement · 9 Nov 2022
- A259 Dumb Bell Roundabout - Use Both Lanes traffic survey · £12,000 · 9 Nov 2022
- T0383 TRAS3074 Development of Speed-Emission/Energy Curves and Costs Data for Ultra Low Emission Vehicles · £74,519 · 4 Nov 2022
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Highway Drainage Cleansing · London Borough of Bromley · £4,000,000
- Clay Lane Attenuation Basin · City of Doncaster Council
- PS-25-204 - New Cumnock Early Childhood Centre – Drainage Alterations (PRJ0013744) · East Ayrshire Council · £55,716
- Below Ground Drainage Provision Including CCTV · Fife Council · £3,000,000
- A70014 Tender Package (Stocking Lane Drainage & New Road Drainage) · The North Yorkshire Council
- Call off contract from Framework DN772512 · West Lancashire Borough Council · £50,000
- Drainage · CROYDON COUNCIL · £100,000
- ENHT - Renal Plant Concrete & Drainage System Works · East & North Hertfordshire NHS Trust · £225,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.