621621 - A194(M) SB & A184 Whitemare Pool Rbt Resurfacing
key details
| Value | £2,749,664 |
|---|---|
| Status | complete |
| Category (CPV) | 45233210 |
| Region | North East, North West |
| Deadline | 29 Jun 2025 |
| Contract start | 30 Jun 2025 |
| Contract end | 5 Dec 2025 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-beb1c77d-df53-4261-b93d-ef2a30c1a382 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| TARMAC TRADING LIMITED | £2,749,664 | 14 May 2025 | active |
description
Background Information for the proposed Work Order
The site is the A194(M) southbound carriageway between the A1(M)/A194(M) Jc 65 Birtley, and the A194(M)/A184T Whitemare Pool roundabout.
The existing pavement surfacing consists of a mixture of a Thin Surface Course System (TSCS) between 7-10 years old, and an aged Hot Rolled Asphalt (HRA). The A194(M) mainline dual carriageway motorway is reaching the end of its serviceable life. Visible defects can be found whilst driving through the A194(M).
Defects such as: longitudinal cracks, exposed longitudinal joint, edge cracks, transverse cracks, fretting, and some early developed potholes. Whitemare Pool circulatory carriageway is also included as part of the scheme due to road pavement
degradation.
The proposed work consists of resurfacing the A194(M) Southbound (SB) mainline carriageway, slip roads, designated lanes, and hard shoulder, as well as the A194 WMP Circulatory road pavement.
Associated assets influenced by the works are to be re-established as per the existing layout. This includes road markings and studs, traffic and weather loops/sensors and bridge joints. There is also one traffic sign face to be renewed.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 11 Nov 2025 | Award (award) | · | 8e730f35-eb15-4029-9d39-9ece0412e2f5-871645 |
more from National Highways
- PDF - Framework - A120 Horsley Cross - Parkeston Rbt Harwich Safety Impt · £28,022 · 28 Nov 2025
- PDF Framework - A27 Falmer Footbridge Headroom · £2,390 · 28 Nov 2025
- PDF Framework - RM1016 Holyport interchange · £11,909 · 28 Nov 2025
- PDF Framework - A5 EB WB M42 J10 - A5148 Wall SCRIM · £302,105 · 28 Nov 2025
- PDF Framework - A23 S Downs Way, Hickstead, Pyecombe Bundle - SDF Part 2 & 3 · £3,921,468 · 28 Nov 2025
- PDF Framework - A63 Brighton Street to Daltry Street Resurfacing · £555,028 · 28 Nov 2025
- PDF Framework - M6 J9 SB & NB Bescot Viaduct Pavement Hybrid Group 43 · £40,084 · 28 Nov 2025
- GI - BAM A38 signing · £43,972 · 28 Nov 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PDF Framework - A38 NB Exit to Toyota Island Pavement · National Highways Limited · £182,463
- PDF Framework - A64 Grimston to Hopgrove Pavement · National Highways Limited · £552,596
- PDF Framework - A3 NB & SB Thursley-Hindhead Tunnel · National Highways Limited · £1,680,475
- PDF Framework - A14 J33 to J34 NRTS Ducted Network · National Highways Limited · £70,912
- Supply Chain Relationship · National Highways Limited · £1,683
- PDF Framework - A38 NB SB Weeford Island - Toyota Pavement · National Highways Limited · £530,778
- PDF framework - A500 Campbell Road - Waterproofing - Structures - Construction (Pavement) · National Highways Limited · £112,611
- PDF Framework - M5 J24-25 INCL J24 EXIT AND ENTRY SLIPS SB MP 195.0-203.0 RS · National Highways Limited · £3,341,673
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.