description

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.

The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.

The Project comprises:

  • a.tunnels:
  • i.a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
  • ii.11 connection tunnels, which will link flows from CSOs to the main tunnel.
  • b.Worksites:
  • i.five main tunnel Worksites (drive and/or reception sites)
  • ii.16 CSO Worksites
  • iii.two System modification Worksites Thames Tideway Tunnel
  • iv.works at Beckton Sewage Treatment works.

Section 4: Scope of Works

The Subcontract works include but are not limited to:

ACTST: Scope of works include the supply and installation of:

Swale Features
Edging + Granite kerbs
Wildflower meadow
Reinstate Grass area
Shrub planting
Trees + tree pits

BAREL: Scope of works include the supply and installation of:

Wildflower Meadow Planting
Gravel maintenance strip
Grass seeding
Wet tolerant grass

CARRR: Scope of works include the supply and installation of:

Trees + Tree Pits
SUDS area with planting
Root barriers
Structural soft cells
Bio Retention area
(Tree root management system)
Bird boxes

DRMST: Scope of works include the supply and installation of:

Intertidal terrace planting
Reinstated planting to Causeway Island
Trees and tree pit
Gravel margins
Planting

Site Specifics:

  • See marked up drawing of DRMST Areas - showing sequencing

KNGGP: Scope of works include the supply and installation of:

Power and water supply
Signage and Wayfinding
King Georges Park granite signage kerb
Litter bins
Soft landscaping to park entrance
Woodland planting
Root barriers to trees

Site Specifics:

-See marked up drawing of KNGGP Areas - Areas 1 + 2 only for this package.
-CSO requires weight loading exclusion zone - no machine loading
-Paving + Asphalt by others
-Area handed over to landscape contractor from below subsoil formation level.

PUTEF: Scope of works include the supply and installation of:

Grass seeding and subsoil build up to Watermans Green
Reinforced turf and subsoil build up

The Subcontractor is to allow for:

-Surface finish infill to all access covers
-Foundations and haunching to all feature installations named within scope above - kerbs, drains etc..
-Coordination with hydraulic cover installer to ensure cover setting out. Contractor should allow a visit per worksite for s/o of hydraulic.
-Allow to work around and coordinate installation with in ground luminaires, conduits and ducts, and metalwork (handrails)
-Movement details against all structures, and architectural installations (Kiosks/ beches/ Ventilation columns)
-Coordination with soft landscaper for termination/ interface details
-All lifting/ craneage associated with the delivery installation of the Subcontract works.
-Works adjacent to water for the intertidal terrace at DRMST
-Delivery and unloading of all materials and equipment
-Temporary works designs associated with the works. This includes the provision of any CAT 1, 2, or 3 which may be required to satisfy any Subcontractor temporary works designs.
-Samples and mockups for approval in accordance with the Specifications and Works Information documents.
-All documentation issued in time for approval to include (but not limited to):
oMethod Statements + Risk Assessments (RAMS)
oFactory + Installation Inspection and Test Plans (ITPS)
oMaterial Compliance Records (MCRS)
oLifting Plans
oDesigner Competency form
oISO 9001
oDesigners CV
oDesigners Matrix
oOrganisational Chart

The Subcontractor shall comply with the requirements set out in the Works Information and BMB procedures.

Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.

Quotations will be evaluated based on;

Cost

Timeliness of return

Adherence to and demonstration of understanding of the drawings and specifications provided at this point.

Provision of accurate product specifications to accompany the quotation.

Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.

Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)

BMB JV Sites

(ACTST) BMB-JV Tideway West, Acton Storm Tanks, Canham Road, W3 7SR

(BAREL) BMB-JV Tideway West, Barn Elms, Queen Elizabeth Walk, Richmond upon Thames, SW13 0DG

(CARRR) BMB-JV Tideway West, Carnwath Road Riverside, Carnwath Road, London Borough of Hammersmith & Fulham, SW6 3HR

(DRMST) BMB-JV Tideway West, Dormay Street, Wandsworth, SW18 1EY

(KNGGP) BMB-JV Tideway West, King George's Park, Neville Gill Close, Wandsworth , SW18 4BS

(PUTEF) BMB-JV Tideway West, Putney Pier, Lower Embankment Road, London, SW15 1EJ

Additional information: BMB JV Sites

(ACTST) BMB-JV Tideway West, Acton Storm Tanks, Canham Road, W3 7SR

(BAREL) BMB-JV Tideway West, Barn Elms, Queen Elizabeth Walk, Richmond upon Thames, SW13 0DG

(CARRR) BMB-JV Tideway West, Carnwath Road Riverside, Carnwath Road, London Borough of Hammersmith & Fulham, SW6 3HR

(DRMST) BMB-JV Tideway West, Dormay Street, Wandsworth, SW18 1EY

(KNGGP) BMB-JV Tideway West, King George's Park, Neville Gill Close, Wandsworth , SW18 4BS

(PUTEF) BMB-JV Tideway West, Putney Pier, Lower Embankment Road, London, SW15 1EJ

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
16 Jan 2020 Tender (tender) · 8a7e8226-a42a-46af-bc41-bd7ffb7a7828-337641

more from BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.