gvtcx

SDF Lot 3.2 North West_ Premier Traffic Management Limited A

Highways England Published 1 Feb 2022 Contracts Finder

key details

Value£17,469,678
Statuscomplete
Category (CPV) 45000000
RegionNorth West
Deadline8 Mar 2021
Contract start14 Jan 2022
Contract end31 Aug 2027
Procedureselective
SME suitableYes
OCIDocds-b5fd17-967d6fe9-5994-427c-b5a6-e21787c5d687

Awards (2)

This procurement was awarded to 1 suppliers. Values shown are per-award; the notice total is £17,469,678.

SupplierValueDateStatus
Premier Traffic Management Limited £17,469,678 14 Jan 2022 active
Premier Traffic Management Limited · · active

description

National Highways continues to roll out the Asset Delivery model to its operational areas. There is a requirement to deliver a range of renewal, improvement and selected small scheme construction works on the Strategic Road Network in areas utilising specialist contractors working collaboratively with National Highways to deliver these works. It is envisaged that this framework will straddle two Road Investment Strategy (RIS) periods (RIS 2 and RIS 3) enabling a smooth transition between them. Works for schemes have been divided into a number of workstreams that align with the contractors' specialisms, and will also include design.

Bandings have been introduced into the framework model to differentiate some contracting terms between bands.

This award is for Lot 3.2 Temporary Traffic Management (region) in the North West region (National Highways Areas 10 and 13).

Deliver Schemes

This Lot covers the supply of materials, plant and labour for the;

  • Design, installation, maintenance and removal of temporary traffic management
  • Installation, maintenance and removal of temporary safety barrier systems
  • Installation, maintenance and removal of temporary speed enforcement systems
  • Installation, maintenance and removal of temporary CCTV systems.
  • Management of breakdown recovery services
  • Installation, maintenance and removal of temporary road markings and road studs, and
  • Removal of existing road markings and road studs

Other duties This scope also includes:

  • Mobilisation
  • Early Contractor Involvement
  • Principal contractor
  • Welfare facilities
  • Manage Network Occupancy
  • Community; and
  • Contingency

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
1 Feb 2022 Contract award notice (F03) Earlier regulations 002906-2022
1 Feb 2022 Award (award) · 2a150ee0-8b98-4fa4-b2fd-4a15ca5ccbf9-506006

more from Highways England

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.