Chesterfield Borough Council - Depot Rationalisation.

NOE-CPC Published 11 Feb 2019 Contracts Finder

key details

Statuscancelled
Category (CPV) 73220000
Deadline15 Mar 2019
Contract start1 May 2019
Contract end19 Jul 2019
Procedureopen
SME suitableYes
OCIDocds-b5fd17-94e9b1d9-f2f7-44f9-ab9b-80218fe18998

description

Chesterfield Borough Council is working with other public sector partners (appendix 2) to assess the feasibility of co-locating depot facilities based within in the Chesterfield / M1 corridor and subsequently releasing land for development.

Funding for the feasibility study has been received under the One Public Estate Programme and the feasibility study should be complete by July 2019.

This is the first of a likely series of staged commissions. Each commission will aim to reach a decision gateway that will dictate the direction and / or need to proceed to the next stage and the scope of the support services required to achieve this.

Chesterfield Borough Council is looking to commission the following work

  • oDevelop and deliver a project which will ensure the depot feasibility study is completed by 19th July 2019. Milestones for desktop completion, engagement completion and interim report completion should be clearly included in the tender submission.

The feasibility study should include the following activities:

  1. Complete a detailed review of public sector depot assets, including their current utilisation, their likely future maintenance costs and their future development potential. Current known assets for inclusion are attached in Appendix 1. Consideration of HS2 implications should be captured within the review.
  1. Engage with stakeholders to assess their broad future space requirements, both on an individual basis and on an integrated basis, supported by service redesign. Appendix 2 details the known stakeholders. The scope of the project is such that consideration will be given to additional stakeholders should options arise. Any such options will be developed in consultation with the successful contractor.
  1. Identify potential future delivery sites, including referencing how different locations could serve different or wider geographies depending on their connectivity. Proximity to local authority operating areas should be captured and likely changes to operating costs should be reflected in the feasibility study.
  1. Complete site suitability analysis, with massing diagrams and conceptual floor plans, showing design thoughts about service delivery elements. Provide costs on a ?/m2 basis.
  1. Provide high level technical commentary on planning / highways and other technical constraints (specify what will be excluded from scope) to inform the above. Discussions with the Local Planning Authority and Highways Authority should be held.
  1. Provide a market assessment of land values, rents and yields for the existing depot bases to be used in a more detailed financial case supporting the project. Consult with stakeholders to ascertain where this information is already available.
  1. Complete a detailed financial and economic assessment (costs / viability / affordability and contribution to critical factors identified in the OPE bid). This should ...

Additional information:

Is a Recurrent Procurement Type? : No

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
11 Feb 2019 Tender cancelled (tenderCancellation) · ff1b457a-84ce-48a4-b9fb-c356fab16224-269148

more from NOE-CPC

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.