Carlton Active - RIBA Stages 3 & 4

Gedling Borough Council Published 24 Mar 2026 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£2,029,967
Statuscomplete
Category (CPV) 71530000 +1 more
RegionEast Midlands
Deadline13 Mar 2026
Contract start16 Mar 2026
Contract end26 Oct 2026
Procedureselective
SME suitableYes
OCIDocds-b5fd17-8e99c328-0e8b-435b-9afe-539040c95f03

Award

SupplierValueDateStatus
Alliance leisure Services Ltd £2,029,967 16 Mar 2026 active

description

This requirement is a call-off contract using the UK Leisure Framework https://leisureframework.co.uk/ which is a specialist procurement framework supporting leisure centre building.

Pre-construction services covering RIBA Stages 3 and 4 will develop the Carlton Active project from concept design to a fully coordinated and priced construction package. RIBA Stage 3 will progress the developed design, coordinating architectural, structural, civil and MEP designs, undertaking surveys and technical assessments, and preparing the planning application and supporting documentation. RIBA Stage 4 will produce the detailed technical design, specifications and construction information, undertake supply chain engagement and cost planning, and establish the final construction price and programme, enabling the Council to reach cost certainty and enter into a construction contract.

RIBA 3

Refined GA plans, sections, and elevations
Updated site plans including access, parking, and landscape strategy
Coordination of structure, MEP and architecture
Updated accommodation schedules and space planning
Concept visuals and external façade development
Draft outline specifications for architectural and engineering packages
Statutory compliance coordination (e.g. planning, Building Regs pathway)
Updated Risk Register and Project Execution Plan
Revised Cost Plan informed by contractor and subcontractor market inputs
Initial market testing of key packages
  • Updated outline programme and procurement strategy
Surveys commissioned and summarised where applicable
Design Development Pack
RIBA Stage 3 Summary Report and Recommendations

RIBA 4

Fully coordinated architectural, structural, and MEP technical design drawings
Updated and finalised accommodation schedule and internal GA layouts
External works drawings and supporting documentation (e.g. drainage, landscape)
Detailed performance specifications across all disciplines
Fully itemised FFE and equipment list
Compliance documentation (e.g. Part M, planning conditions)
Building regulation strategy finalisation
Final coordination of contractor-led design inputs
Market-tested prices
Contractor proposal review and evaluation
Updated Cost Plan converted to fixed-price basis
Final Project Execution Plan including contract readiness review
Final programme for construction and handover
Cost Certainty Development Proposals
Development Management Agreement (DMA) sign-off ready pack

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
24 Mar 2026 Award (award) · 49060507-81f4-4565-b6a2-5fa16e6a8374-889864

more from Gedling Borough Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.