gvtcx

TRN No. 1043/07/2015 - Evidence Gathering – Low Carbon Heating Technologies

DEPARTMENT OF ENERGY AND CLIMATE CHANGE Published 18 Nov 2016 Contracts Finder

key details

Value£160,000
Statuscomplete
Category (CPV) 73200000 +2 more
RegionLondon
Deadline7 Aug 2015
Contract start7 Sept 2015
Contract end6 Dec 2015
SME suitableYes
OCIDocds-b5fd17-8e52483b-adc8-11e6-9901-0019b9f3037b

Awards (2)

This procurement was awarded to 2 suppliers. Values shown are per-award; the notice total is £160,000.

SupplierValueDateStatus
The Building Research Establishment shared £112,485 6 Sept 2015 active
The Carbon Trust shared £112,485 6 Sept 2015 active

description

In light of the UK ambitious renewable heating and carbon reduction targets, this project seeks to gather evidence about the technical potential and performance of low carbon heating technologies.

The research will focus on the following technologies:

1.Domestic High Temperature Heat Pumps – defined as systems which are <45kWth, able to deliver flow temperatures of at least 60°C at a COP of 2.2, they can be either ground or air-source.
2.Domestic Hybrid Heat Pumps – defined as a gas boiler in combination with a heat pump, air or ground source, both components should be <45kWth. It must have an intelligent control system capable or directly switching between heat sources.
3.Gas Driven Heat Pumps – defined as a gas driven heat pump which uses a thermal compressor. It should be <45kWth in capacity and can be either air or ground source.
4.Hybrid Solar Photovoltaic-Thermal Panels (PV-T) – defined as a packaged solar panel which contains both photovoltaic cells and a thermal collector actively working as one system.

The overall aim of the study is to provide an overview of the current status of these low carbon heating technologies, understand their in-use performance and market potential. In addition to provide a gap analysis to establish where additional evidence gathering is required to provide a comprehensive picture of these technologies in the UK.

Each technology will be treated as a separate study and therefore each represents a different Lot within the tender.

Please make it clear in your submission which Lot(s) you are bidding for. If you wish to bid for more than one Lot, only one submission is required; however, please note you may not be awarded the work for all Lots so costs must be kept separate.

Lot 1 - Domestic High Temperature Heat Pumps
Lot 2 - Domestic Hybrid Heap Pumps
Lot 3 - Gas Driven Heat Pumps
Lot 4 - Hybrid Solar Photo Voltaic Thermal Panels.

Additional information: Please register your interest in submitting a tender for this project by emailing sidteateam@decc.gsi.gov.uk quoting the tender reference number in the subject field. This will ensure you receive immediate notification of updates to the ITT process or answers to questions raised by potential bidders.

Please read the instructions on the tendering procedures carefully since failure to comply with them may invalidate your tender. Your tender must be returned electronically by e-mail and by Friday 7th August 2015 14:00 hrs clearly marked as “TENDER” quoting the tender reference number. On the e-mail submission please state what lots you are applying for and list both the completion date and the price offered (excluding VAT) for each lot.

Any late submissions will not be considered. DECC reserves the right to halt the procurement process and to not award a contract. DECC will not be held liable for recovery of costs from unsuccessful bids if a contract is not awarded. All costs will be borne by the bidding organisations. If a contract is created it will be upon DECC Standard Terms and Conditions, which are available on Contracts Finder with this notice.

Interviews, if deemed necessary, will be held Thursday or Friday in week commencing w/c 10th August 2015 (suppliers will be notified of this beginning of the week commencing 10th August 2015. If successful and upon contract signature, the supplier is expected to attend a kick-off meeting taking place in w/c 7th September 2015. Project completion is required by 6th December 2015.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
8 Jul 2015 Award (award) · ocds-b5fd17-8e52483b-adc8-11e6-9901-0019b9f3037b-68745-trn-no.-1043-07-2015

more from DEPARTMENT OF ENERGY AND CLIMATE CHANGE

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.