Regional Delivery Partnership - Delivery Integration Partner Framework (RDP-DIP)
key details
| Status | complete |
|---|---|
| Category (CPV) | 45000000 |
| Region | North East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, South East, South West |
| Deadline | 28 Mar 2023 |
| Contract start | 29 Mar 2023 |
| Contract end | 28 Feb 2026 |
| SME suitable | No |
| OCID | ocds-b5fd17-85c20890-eb5d-4a31-be0b-c93397036d23 |
Awards (13)
This procurement was awarded to 13 suppliers. Values shown are per-award; the notice total is ·.
| Supplier | Value | Date | Status |
|---|---|---|---|
| Alun Griffiths (Contractors)Ltd shared | £0 | 28 Mar 2023 | active |
| Balfour Beatty Civil Engineering Ltd shared | £0 | 28 Mar 2023 | active |
| BAM Nuttall Ltd shared | £0 | 28 Mar 2023 | active |
| Costain Ltd shared | £0 | 28 Mar 2023 | active |
| Galliford Try Infrastructure Ltd shared | £0 | 28 Mar 2023 | active |
| John Graham Construction Ltd shared | £0 | 28 Mar 2023 | active |
| Keltbray Group Ltd shared | £0 | 28 Mar 2023 | active |
| Kier Construction Ltd shared | £0 | 28 Mar 2023 | active |
| Octavuis Infrastructure Ltd shared | £0 | 28 Mar 2023 | active |
| Sir Robert McAlpine Ltd shared | £0 | 28 Mar 2023 | active |
| Skanska Construction UK Ltd shared | £0 | 28 Mar 2023 | active |
| VINCI Construction UK Ltd T/A Taylor Woodrow shared | £0 | 28 Mar 2023 | active |
| Volkerfitzpatrick Ltd shared | £0 | 28 Mar 2023 | active |
description
On the 29 March 2023 National Highways entered into deeds of variation with the suppliers on the Delivery Integration Partner Framework (the "Framework"). These deeds of variation extend the duration of the Framework for those suppliers until 28 February 2026. The variation also amends the scope to make clear that projects that form part of Road Period 3 (2025-2030) in addition to those in Road Periods 1 and 2, may be awarded through the framework, and this may include projects designated as Road Period 3 pipeline schemes and housing infrastructure land and housing investment grant schemes.
The Framework was originally awarded on 19 November 2018 for a period of 6 years pursuant to the OJEU notice with reference 2018/S 010-017461.
The variation is a permitted modification pursuant to Regulation 72(1)(e)/72(8) because:
- the modification does not render the framework agreement materially different in character from the one originally concluded and does not extend the scope considerably . The nature of the tasks that may be performed by Framework suppliers remains the same as those set out in the original procurement i.e. the development, design and construction of capital road projects;
- the modification does not change the economic balance of the Framework in favour of the suppliers in a way not originally provided for. While projects that could be awarded under the Framework may now fall within Roads Period 3, the overall value of the Framework will remain within the originally advertised value of £8.7 billion. The modification will also not result in any changes to the economic risk profile or the terms of any individual contracts let under the Framework;
- no new suppliers are introduced to the Framework;
- for the reasons set out above, the modification does not introduce conditions which, had they been part of the initial procurement procedure would have allowed for the admission of other candidates; allowed for the acceptance of other tenders; or attracted other participants.
For the avoidance of doubt, National Highways is not required to publish this notice but does so in the interests of transparency.
National Highways is currently engaged in the procurement of its Integrated Delivery Framework ("IDF") (please see PIN reference 2023/S 000-003678). This modification ensures continuity of framework provision and scheme delivery until it is succeeded by the IDF arrangements
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 29 Mar 2023 | Award (award) | · | 02900fbc-ab1d-413b-a656-edc86840e3d9-629174 |
more from National Highways
- PDF - Framework - A120 Horsley Cross - Parkeston Rbt Harwich Safety Impt · £28,022 · 28 Nov 2025
- PDF Framework - A27 Falmer Footbridge Headroom · £2,390 · 28 Nov 2025
- PDF Framework - RM1016 Holyport interchange · £11,909 · 28 Nov 2025
- PDF Framework - A5 EB WB M42 J10 - A5148 Wall SCRIM · £302,105 · 28 Nov 2025
- PDF Framework - A23 S Downs Way, Hickstead, Pyecombe Bundle - SDF Part 2 & 3 · £3,921,468 · 28 Nov 2025
- PDF Framework - A63 Brighton Street to Daltry Street Resurfacing · £555,028 · 28 Nov 2025
- PDF Framework - M6 J9 SB & NB Bescot Viaduct Pavement Hybrid Group 43 · £40,084 · 28 Nov 2025
- GI - BAM A38 signing · £43,972 · 28 Nov 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Cleeve and Yatton Small Transport Hubs · North Somerset Council · £116,495
- Lowca Community School - Damp remediation works · Cumberland Council · £47,080
- 52 No New Housing Units, Rosskeen, Ross Shire · Highland Council
- L9-102 ATE Monument Roundabout · North Lincolnshire Council
- 26160 - Changing Rooms - AWARD · Telford and Wrekin Council
- Valley Primary School - Partial Roof Replacement · Cumberland Council · £62,775
- CPU 8505 - Construction of a SEND unit at Fernwood Academy School. · Nottingham City Council · £3,064,406
- 25221 - Priorslee Campus - Building M&E Fire Condition Survey - AWARD · Telford and Wrekin Council
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.