Manchester International Airport Platform Remodelling 2nd FBC - OLE Works
key details
| Value | £5,000,000 |
|---|---|
| Status | active |
| Category (CPV) | 45232210 |
| Region | North West |
| Deadline | 28 Feb 2025 |
| Contract start | 30 Jun 2026 |
| Contract end | 30 Apr 2029 |
| SME suitable | No |
| OCID | ocds-b5fd17-7d0fbc33-1e86-4876-be92-40d669d87b6c |
description
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.
The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):
A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.
The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions."
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=90592707 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/2f6ba615-02fd-4726-9c80-4e5a6fbfc963 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 17 Feb 2025 | Tender (tender) | · | 2f6ba615-02fd-4726-9c80-4e5a6fbfc963-826876 |
more from Kier Transportation - CP7 NWC
- Manchester International Airport - Compound Set Up Electrical · £100,000 · 23 Feb 2026
- Manchester International Airport - Temporary Works Piling Enabling Works · £500,000 · 10 Feb 2026
- Manchester International Airport Platform Remodelling - Temporary Works Design · £150,000 · 12 Jun 2025
- Manchester International Airport Platform Remodelling 2nd FBC - Signal Gantry copy · £500,000 · 18 Feb 2025
- Manchester International Airport Platform Remodelling 2nd FBC - Signal Gantry · £500,000 · 17 Feb 2025
- Manchester International Airport Platform Remodelling 2nd FBC - Surfacing · £500,000 · 17 Feb 2025
- Manchester International Airport Platform Remodelling 2nd FBC - Temporary steel footbridge · £100,000 · 17 Feb 2025
- Manchester International Airport Platform Remodelling 2nd FBC - Structural Steel Stairs · £250,000 · 17 Feb 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Framework for Overhead Line Construction Works - Distribution Voltages · SSE plc
- CO Construction - 132kV Trident OHL - LT295 Bhlaraidh Ext 1028 · SSE plc
- AF Line 132kV reinforcement works · ELECTRICITY NORTH WEST LIMITED · £35,000,000
- Provision of Emergency Section Insulator Replacement for MML · WEST MIDLANDS COMBINED AUTHORITY · £51,285
- Overhead Line Equipment (OLE) 24/7 Emergency Response Term Service for Midland Metro Limited (MML) LC082 · West Midlands Combined Authority · £66,389
- Midland Metro Limited (MML) - Overhead Line Equipment Services Framework · West Midlands Combined Authority on behalf of Midland Metro Limited · £6,000,000
- Construction & Refurbishment of Distribution Overhead Lines Contract · Northern Ireland Electricity Networks Limited
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.