Manchester International Airport - Compound Set Up Electrical

Kier Transportation - CP7 NWC Published 23 Feb 2026 Contracts Finder

key details

Value£100,000
Statusactive
Category (CPV) 45317000 +1 more
RegionNorth West
Deadline13 Mar 2026
Contract start25 May 2026
Contract end26 Jun 2026
SME suitableYes
OCIDocds-b5fd17-e770a5d9-f90a-4fd8-829d-35bbc29d8a51

description

"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.

The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):

A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.

The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions.

The scope areas for this package are as follows:

  • Electrical install ready for Electricty North West power connection for cabin installation
  • Lighting cable diversion works and any survey works in associated with this
  • Installing lights on the cabins/storage areas
  • Lights on the hoarding at woodhouse lane
  • Install Power supplies to cabins from the MDU
  • Some minor lighting design to support the above"

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
23 Feb 2026 Tender (tender) · 3c39a9d6-36c5-40ff-a9cb-38676ea3d483-885306
26 Feb 2026 Tender (tender) · 61edc992-0de2-402e-b3d4-514525468334-886163

more from Kier Transportation - CP7 NWC

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.