Investigation into Unauthorised Structural Subsystems
key details
| Value | £51,000 |
|---|---|
| Status | complete |
| Category (CPV) | 71311200 |
| Deadline | 19 Aug 2022 |
| Contract start | 5 Sept 2022 |
| Contract end | 8 May 2023 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-7693acbc-7942-4aeb-8356-70906ef1adf0 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| NOT AWARDED TO SUPPLIER | £0 | 4 Nov 2022 | active |
description
NOT AWARDED - no bids received - tender published again as ORR/CT/22-38
The ORR are aware of an issue where sub-systems have been brought into use without an Interoperability authorisation. The ORR want, on a NR Region basis the following;
- The size of the issue determined (i.e the number of sub-systems brought into use without an authorisation where an authorisation was most likely required).
- The significance of the issue in terms of regulatory compliance as well as future safety, quality and cost implications.
- An evidenced opinion on the cause(s) of the issue.
- An informed opinion on whether the issue is ongoing and whether NR are adequately addressing the issue.
The scope shall include the following:
| • | NR led and 3rd Party projects going back to 1st April 2017.Collecting evidence from Network Rail Sponsors, DEAM's and Capital Delivery Directors on current and previous construction projects dating back to 2017 with ORR authorisation tracker |
| • | Investigating a sample of infrastructure project completed, including but not exclusively 3rd party station projects dating back up to 5 years, use this a base line, collect statements from Network Rail |
| • | Investigating a sample of current projects in progress but not captured in ORR authorisation tracker |
| • | The consultant shall ensure the Network Rail and 3rd party owned projects receive equal scrutiny, we are interested to understand the relationship that both 3rd parties and Network Rail have with the authorisation process |
| • | Understanding relationship of ASPRO (Asset Protection and Optimisation) with 3rd parties |
| • | Understanding why any identified unauthorised works continued without a Network Change Notification |
| • | Investigating differences in process and acceptance between SRPs (System Review panel) across the regions to understand level of variability across the Network |
| • | Provide evidence of good and poor practices |
documents
- https://www.contractsfinder.service.gov.uk/Notice/2e04ff08-6ecb-4572-a19d-2477e2cb4f8e , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/15185f8e-0a88-4ff1-a312-ceeb3e7ee3fa , biddingDocuments
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/4c2f716b-e8cc-49cc-943d-cc6b149067db , biddingDocuments
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/e34cd9d8-f4d8-4892-879b-ccde3a1bba0e , biddingDocuments
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/f0dafacd-e6d4-454e-adca-63e818be4f01 , biddingDocuments
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/6db22a89-024c-4207-a817-6d5f4570a4c9 , biddingDocuments
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 4 Nov 2022 | Award (award) | · | 7e8f2b21-77ad-424f-b3f4-784695ccf041-586555 |
more from OFFICE OF RAIL AND ROAD
- Fare enforcement T&Cs focus groups and call for evidence follow-up interviews · £45,890 · 6 Mar 2025
- ORR Suite of Contracts · £27,650 · 6 Mar 2025
- Fare enforcement staff research · £87,825 · 6 Mar 2025
- Strategic Regulatory Advice · £35,000 · 6 Mar 2025
- Occupational Health & EAP · £26,979 · 6 Mar 2025
- Engineering Roles · £45,000 · 5 Mar 2025
- Complaints Handling Satisfaction Survey · £120,000 · 7 Feb 2025
- TDL Enhancements and Support · £146,250 · 23 Jan 2025
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Mass Transit Commercial Support Services · West Yorkshire Combined Authority · £104,000
- Strategic Transport Support Services · Blackburn With Darwen Borough Council · £150,000
- GLCCA - Mobility Hubs Feasibility Study in Greater Lincolnshire · Greater Lincolnshire Combined County Authority · £40,001
- GLCCA - Water-based Transport Feasibility Study in Greater Lincolnshire · Greater Lincolnshire Combined County Authority · £18,001
- Transport Transition Support for East Midlands Combined County Authority · Nottinghamshire County Council · £171,359
- Sports Quarter Parliamentary Agents · WEST MIDLANDS COMBINED AUTHORITY · £200,000
- THRE02-C09 - Provision of Technical Advisors to Support Rail Operating Contract Projects · DFTO · £189,019
- ITS WORLD CONGRESS 2027 - COMMUNICATION SUPPORT · WEST MIDLANDS COMBINED AUTHORITY · £54,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.