Thames Tideway Tunnel - C405 Main Works West - Pipe Jacking works for Syphon Main ACTST
key details
| Value | £500,000 |
|---|---|
| Status | complete |
| Category (CPV) | 44114220 +1 more |
| Region | London |
| Deadline | 16 Apr 2021 |
| Contract start | 17 May 2021 |
| Contract end | 30 Jun 2021 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-75ec3987-74d3-4ab8-99ee-c271587b5f58 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Joseph Gallagher Ltd | £548,000 | 15 May 2021 | active |
description
The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.
The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.
The Project comprises:
- a.tunnels:
- i.a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
- ii.11 connection tunnels, which will link flows from CSOs to the main tunnel.
- b.Worksites:
- i.five main tunnel Worksites (drive and/or reception sites)
- ii.16 CSO Worksites
- iii.two System modification Worksites Thames Tideway Tunnel
- iv.works at Beckton Sewage Treatment works.
Scope of Works
Excavation of pits to create launch and reception pits.
Temporary propping and all other temp works design.
Microtunnelling and pipe jacking
CCTV survey
remedial works
backfill
Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.
Quotations will be evaluated based on;
Cost
Timeliness of return
Adherence to and demonstration of understanding of the drawings and specifications provided at this point.
Provision of accurate product specifications to accompany the quotation.
Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.
Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.
BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)
Acton Storm Tanks Worksite
Additional information: Acton Storm Tanks Worksite
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=54864177 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/ffabb85d-5c8e-4f99-b746-3bdbc5023b8e , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 8 Jul 2021 | Award (award) | · | d45fa0d5-95ca-47ed-ad44-0f03395e6dc0-449135 |
more from BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)
- Thames Tideway Tunnel - C405 Main Works West - Carnwath Road Pit Bottom Steel Alterations · £1 · 5 Jul 2021
- Thames Tideway Tunnel - C405 Main Works West - Intertidal Terrace · £1 · 5 Jul 2021
- Thames Tideway Tunnel - C405 Main Works West - Permanent Formwork Decking · 12 Mar 2021
- Thames Tideway Tunnel - C405 Main Works West - Hammersmith Security Gates & Fencing · £1 · 17 Feb 2021
- Thames Tideway Tunnel - C405 Main Works West - Main Tunnel Steel Connection Shutters · 5 Feb 2021
- Thames Tideway Tunnel - C405 Main Works West - Bulkheads (Acton) · £1 · 8 Jan 2021
- Thames Tideway Tunnel - C405 Main Works West - Hammersmith Connection Culvert Bulkhead · £1 · 21 Oct 2020
- Thames Tideway Tunnel - C405 Main Works West - Putney Tunnel Connection Shutter · 21 Oct 2020
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Thames Tideway Tunnel - C405 Main Works West - Rising Main Ducting Works · BIP SOLUTIONS LIMITED · £1
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.