gvtcx

1-723 Technical Consultancy for M48 Severn Bridge Main Cable Assessment

Highways England Published 5 Feb 2019 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£84,849
Statuscomplete
Category (CPV) 73000000
RegionLondon
Deadline31 Jan 2019
Contract start5 Feb 2019
Contract end28 Feb 2021
Procedureselective
SME suitableNo
OCIDocds-b5fd17-68e03308-748a-4a7c-877f-3f7050c1853c

Award

SupplierValueDateStatus
Atkins £84,849 5 Feb 2019 active

description

The objectives are to review the traffic loading (WIM) data, Acoustic Monitoring and Dehumidification data for each three monthly period and produce quarterly reports.

Carry out a yearly review of all the data and produce a report for that period.

When required on a call off basis carry out a BSALL assessment due to unforeseen events i.e. excessive wire breaks (outside criteria laid down in the Monitoring Specification), abnormal traffic loadings, caused by queuing on the structure etc.

Review all the documentation and produce an Assessment Certificate.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
5 Feb 2019 Award (award) · 6963ed94-8b17-4752-a057-d29d89f79346-267962

more from Highways England

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.