Contract 93 - Fire Compartmentation 2024-26

North Tyneside Council Published 6 Jun 2024 Contracts Finder

key details

Value£1,500,000
Statusactive
Category (CPV) 45000000 +1 more
Deadline12 Jul 2024
Contract start1 Oct 2024
Contract end30 Sept 2026
Procedureopen
SME suitableYes
OCIDocds-b5fd17-5e21057a-4b79-41b6-85cb-eab2b263079f

description

This Framework Contract (FW) will ensure the availability of skilled Contractors to deliver the above Framework, requiring differing values and complexities as required during the Framework Contract and intends to have 2 lots under this framework:

Lot 1 : Responsive Repairs Lot 2 : Planned Works

Contractors should note that both lots include work in both residential and commercial premises.

The FW duration is initially for 24 months with two options to extend for a further 12 months each at the sole discretion of the Authority and is anticipated to commence in October 2024.

Each Call Off will state whether the Frameworks Contractor will be operating in the capacity of either Principal Contractor or Sub Contractor which will be determined on a project specific basis.

The works required under this FW can include, but is not limited to:

  • Liaison with Authority Design Team, Estimators, Authorised Officers
  • Liaison with other Contractors
  • Production measurements
  • Developing compliant fire stopping solutions
  • Supplying and installing fire batts
  • Supplying and installing proprietary fire curtains
  • Supplying and installing other fire resistant proprietary products
  • Making Good penetrations

This FW Contract will ensure availability of skilled Contractors to deliver the Planned Service requiring differing values and complexities as required for the Framework Contract. Successfully awarded Contractors will be required to work together with North Tyneside Council (the Authority) to drive improvements and support the aims and ambitions of the Contract.

Further information and the full Tender documents are available to download immediately after registering an interest in this opportunity

Additional information:

Award Criteria

The full detail's of the award criteria are included in the Tender Documents

Contract Duration

Contract Duration

The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.

Number of Successful Tenderers

The maximum number of Contractors to be awarded on the Framework = 3 (three) per Lot

Accessing Tender documents

Interested Suppliers must access the Tender documents for further information, which are available to download immediately in the NEPO Portal after registering an interest via the link below. Unregistered Suppliers will be re-directed to a registration page, registration is free.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
6 Jun 2024 Tender (tender) · d44fd957-dcb2-4775-812b-586efbafca92-757189

more from North Tyneside Council

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.