CPSP 138 A12 Chelmsford (Junction 19) to A120 (Junction 25)Award Letter
key details
| Value | £94,358 |
|---|---|
| Status | complete |
| Category (CPV) | 71244000 |
| Deadline | 19 Jan 2021 |
| Contract start | 9 Feb 2021 |
| Contract end | 31 Mar 2021 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-0114a39a-45a6-4df6-937e-67e3b895861e |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Turner & Townsend | £94,358 | 9 Feb 2021 | active |
description
The A12 Chelmsford (junction 19) to A120 (junction 25) is part of the strategic road network and supports national and regional economy by connecting Felixstowe and Harwich ports to London. It links the towns of Chelmsford, Witham, Marks Tey and Colchester.
This road struggles to cope with existing peak traffic levels, resulting in delays and reduced speeds. With few available diversions, accidents lead to traffic disruption over a wide area.
The projected growth in population and local development in the area will only increase the pressures on this road.
To ease congestion and cope with increasing traffic, the A12 is to be widened between junction 19 (Chelmsford) and junction 25 (A120 interchange, Marks Tey).
The project is proceeding to Development Consent order and is in PCF stage 3 - Preliminary Design Stage.
Highways England require a snapshot appraisal of the current project estimate with consideration to its cost accuracy, with appraisal of risk provisions and quality of schedule.
Estimator Requirements
A Senior Estimator is required to lead the project cost appraisal works. The scope includes but is not limited to the following:
| - | Liaison with the Highways England Project Team at all times, developing all cost elements from design or actual data held by the Project Team |
| - | Attendance at Project Team meetings when required, on behalf of the Commercial Division Cost Planning Team |
| - | Appraisal of all non-construction costs - including: |
| - | Historic Costs |
| - | Development Stage Budgets |
| - | Land Cost Estimates |
| - | 3rd Party and other costs |
| - | Non-Recoverable VAT |
| - | Inflation |
The estimator shall develop their independent view of the direct works and indirect works costs, informed by but not necessarily based upon pre-existing cost estimate information.
The estimator shall satisfy themselves that the project construction costs and associated Highways England costs are a fair and considered representation of the current position of the design The estimator shall incorporate risk and schedule information provided by their Risk and Schedule team members and confirm the quality of synergy between the three components.
The estimator will lead liaison with the Risk and Schedule team.
Risk Review Requirements
Working closely with the estimator, the risk appraiser will review the project risk register, Highways England Cost Planning's appraisal or price and quantum range, Project Uncertainty and Portfolio Risk provision. The risk manager shall review the Risk Register with the Project Risk Team with a specific view to it's relationship to the cost estimate and current design the estimate is based upon.
The review shall consider:
| - | Suitability of risks and their probability ranking |
| - | Accuracy of costs of associated risks |
| - | Does the QRA incorporates duration uncertainties and the impact all identified risk events, including portfolio risks |
| - | Does the QRA includes appropriate relationships (e.g. correlations) between related risk events |
| - | Confirm that QRA results c |
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 21 Feb 2021 | Award (award) | · | 8f621a1c-312d-4d5d-af12-b02ea36b2605-414478 |
more from Highways England
- Contract Awarded for Motorway Service Area Energy Storage Systems · £6,561,414 · 15 Feb 2023
- T0399 National Highways Sector Scheme Review · £74,373 · 13 Dec 2022
- Gantries for National Highways · £7,000 · 1 Dec 2022
- T0340 Update of Departures Manual · £39,115 · 25 Nov 2022
- TA SE&E 011 - M27 Junction 10 · £166,004 · 23 Nov 2022
- National Highways Tree/Nurseries Market Engagement · 9 Nov 2022
- A259 Dumb Bell Roundabout - Use Both Lanes traffic survey · £12,000 · 9 Nov 2022
- T0383 TRAS3074 Development of Speed-Emission/Energy Curves and Costs Data for Ultra Low Emission Vehicles · £74,519 · 4 Nov 2022
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Award of Direct Award-26CP027-QEUH-QEUH Emergency Department Redesign-Cost Consultant · NHS Greater Glasgow and Clyde · £4,027
- Award of Direct Award-24CP005-RHC-RHC Atrium Immersive Space-Cost Consultant · NHS Greater Glasgow and Clyde · £6,364
- NBC Cost Management and Assurance Services · DEFRA · £7,139,400
- SRO Bill Impact Modelling · O F W A T · £57,265
- Project Controls & Commercial Services Bridging Contract · Nuclear Restoration Services · £16,500,000
- Provision of Patient Level Information and Costing System (PLICS) Software - Licence Maintenance and Support Renewal · Kings Interventional Facilities Management LLP · £32,606
- Property Services · BANK OF ENGLAND · £242,208
- Sustainable Communities for Learning - Expert Technical Advice · Llywodraeth Cymru / Welsh Government · £8,900,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.