Rockfall Protection System Installation
key details
| Value | £5,000,000 |
|---|---|
| Status | active |
| Category (CPV) | 45243100 +1 more |
| Region | South East |
| Deadline | 21 Jul 2023 |
| Contract start | 13 Nov 2023 |
| Contract end | 1 Jul 2027 |
| Procedure | limited |
| SME suitable | Yes |
| OCID | ocds-b5fd17-56df7eef-5c5c-499c-8ae8-dfe2b2a24d12 |
description
The Contractor provides the management and implementation of the Rockfall Protection Systems 'Phase II - Phase V', summarised below:
- Phase II (Envisaged Commencement within 2023)
The installation of a rockfall protection system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing rockfall protection barrier(s) and the replacement installation of approximately 223m (linear) of a 5m high (projection) GBE-500A rockfall barrier (and approximately 450m2 of a TECCO Stainless Steel (G65/3) slope stabilisation system) manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).
- Phase III Envisaged Commencement within 2024)
The installation of a rockfall protection system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing rockfall protection barrier(s) and the replacement installation of approximately 191m (linear) of a 3m high (projection) GBE-500A rockfall barrier manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).
- Phase IV Envisaged Commencement within 2025)
The installation of a slope stabilisation system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing slope stabilisation systems and the replacement installation of approximately 2750m2 of a TECCO Stainless Steel (G45/2) slope stabilisation system manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).
- Phase V Envisaged Commencement within 2026)
The installation of a slope stabilisation system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing slope stabilisation system and the replacement installation of approximately 2400m2 of a TECCO Stainless Steel (G45/2) slope stabilisation system (and approximately 12m2 of a SPIDER 'S3-130' rock protection system), manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).
documents
- https://www.contractsfinder.service.gov.uk/Notice/775bdf8d-86b1-449e-8015-ac3c82677ec8 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 5 Jun 2023 | Tender amendment (tenderAmendment) | · | 775bdf8d-86b1-449e-8015-ac3c82677ec8-650898 |
more from Dover Harbour Board
- POD - Specialist Design Support Framework · £500,000 · 6 May 2025
- Port of Dover - Multi-Disciplinary Design Framework · £1,000,000 · 6 May 2025
- Cruise Programme · 25 Jul 2023
- DIVE FRAMEWORK 2023-2028 · £600,000 · 16 Jun 2023
- 2024 - 2027 ENSONIFICATION SURVEYS · £400,000 · 15 Jun 2023
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- ESPH AB HBC Cliff Maintenance (ESPH557TI) - AWARD · Hastings Borough Council
- ESPH SB Amber Cliff Works (ESPH169) - AWARD · SE Shared Services
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.