gvtcx

Rockfall Protection System Installation

Dover Harbour Board Published 5 Jun 2023 Contracts Finder

key details

Value£5,000,000
Statusactive
Category (CPV) 45243100 +1 more
RegionSouth East
Deadline21 Jul 2023
Contract start13 Nov 2023
Contract end1 Jul 2027
Procedurelimited
SME suitableYes
OCIDocds-b5fd17-56df7eef-5c5c-499c-8ae8-dfe2b2a24d12

description

The Contractor provides the management and implementation of the Rockfall Protection Systems 'Phase II - Phase V', summarised below:

  • Phase II (Envisaged Commencement within 2023)

The installation of a rockfall protection system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing rockfall protection barrier(s) and the replacement installation of approximately 223m (linear) of a 5m high (projection) GBE-500A rockfall barrier (and approximately 450m2 of a TECCO Stainless Steel (G65/3) slope stabilisation system) manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).

  • Phase III Envisaged Commencement within 2024)

The installation of a rockfall protection system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing rockfall protection barrier(s) and the replacement installation of approximately 191m (linear) of a 3m high (projection) GBE-500A rockfall barrier manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).

  • Phase IV Envisaged Commencement within 2025)

The installation of a slope stabilisation system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing slope stabilisation systems and the replacement installation of approximately 2750m2 of a TECCO Stainless Steel (G45/2) slope stabilisation system manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).

  • Phase V Envisaged Commencement within 2026)

The installation of a slope stabilisation system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing slope stabilisation system and the replacement installation of approximately 2400m2 of a TECCO Stainless Steel (G45/2) slope stabilisation system (and approximately 12m2 of a SPIDER 'S3-130' rock protection system), manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
5 Jun 2023 Tender amendment (tenderAmendment) · 775bdf8d-86b1-449e-8015-ac3c82677ec8-650898

more from Dover Harbour Board

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.