FARRRS Phase 2

Doncaster MBC Published 20 Oct 2016 Contracts Finder

key details

Value£7,000,000
Statuscancelled
Category (CPV) 45000000
RegionYorkshire and the Humber
Deadline15 Nov 2016
Contract start2 Jan 2017
Contract end1 Mar 2018
Procedureselective
SME suitableNo
OCIDocds-b5fd17-567ee43e-adca-11e6-9901-0019b9f3037b

description

The scheme will involve the construction of approximately 1.7km of single carriageway road, with a 50mph speed limit. The road will be constructed mainly over agricultural land, however the road does cross through Brook Wood and Hurst Plantation, which is classified as a Plantation on ancient woodland site.

The new road will be 9.3m wide comprising of two 3.65m lanes with 1m hard strips on either outer edge and a 2.5m wide grass verges. To the north of the alignment there will be a 3m wide combined cycle way footway.

An underpass will be constructed to accommodate the existing Aukley No.5 bridleway Public Right of Way. This will also be used as an agricultural access track linking the severed fields to the north and south of the alignment. The underpass will provide headroom of 4.3m and a width of 4.8m to allow most agricultural vehicles and ridden horses to pass through and will also provide a safe crossing point to protect bats on their foraging route.

The surface water from the carriageway and combined cycleway footway will be drained based on sustainable drainage principals where the surface water uses over the edge drainage into a linear ‘rain garden’, which runs along the majority of the length of road. These drains filter the water and remove pollutants before discharging into attenuation ponds where the surface water is stored and discharged at a controlled rate into the existing drainage systems.

Two new roundabouts will be constructed to tie the scheme into the existing highway network. The first roundabout will be constructed to the south east of the Parrots Corner junction and will link the existing A6182, A638 Bawtry Road and provide access to the Doncaster South Park and Ride Carpark. This will allow the existing signals at the park and ride carpark entrance to be decommissioned.

The second roundabout will connect the scheme to Hurst Lane and Lincoln Green Way replacing the existing traffic signalised junction, which will be decommissioned as part of the works.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
18 Nov 2016 Tender cancelled (tenderCancellation) · 163e3f13-738f-42b8-8ef9-5278ee21e14a-113159

more from Doncaster MBC

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.