gvtcx

MCHFT RAAC Structural Engineering & Survey Inspections

Mid Cheshire Hospitals NHS Foundation Trust Published 2 Oct 2025 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£2,289,010
Statuscomplete
Category (CPV) 71312000
Deadline13 Jun 2025
Contract start24 Jul 2025
Contract end23 Jul 2032
Procedureselective
SME suitableYes
OCIDocds-b5fd17-48562109-a95c-4ecc-9a54-fcba1dd5fd04

Award

SupplierValueDateStatus
Mott MacDonald Limited £2,289,010 1 Oct 2025 active

description

Leighton Hospital, built in the late 1960s and opened in 1972, is one of the most cost-effective acute hospitals and is a sister hospital to Airedale NHS Foundation Trust. Much of the original structure incorporates RAAC panels in its roof and walls, with over 16,500 roof panels and various internal and external wall panels, mostly non-load bearing. Extensive inspections and testing have been conducted, with a risk rating system (P1 to P4) applied to prioritise repairs. Ongoing remedial work includes the installation of steel frameworks, Unistrut supports, and timber reinforcements to address high-risk areas while maintaining hospital operations. RAAC management is overseen by the Estates team and supported by a detailed Structural Risk Appraisal and RAAC Management Plan.

Mid Cheshire Hospitals NHS Foundation Trust undertook a further competition for Reinforced Autoclaved Aerated Concrete (RAAC) structural engineering and survey inspection services under the NHS Shared Business Services Healthcare Planning, Construction Consultancy and Ancillary Services Framework (SBS10190), Lot 3 - Civil and Structural Engineering.

The services is required to deliver both structural engineering and surveying services, with data to be managed through a Common Data Environment provided by BIS Consult. This service will support a multi-year mitigation programme through to the hospital's planned replacement in 2032, after which the current buildings are expected to be demolished.

The contract duration will be seven (7) years, up to the anticipated demolition of the current buildings in 2032. Should demolition be delayed beyond this date, the Contracting Authority reserves the right to extend the contract accordingly, subject to mutual agreement and continued service requirements.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
2 Oct 2025 Award (award) · 3babb64b-9338-48d0-be46-6321df28a976-866687

more from Mid Cheshire Hospitals NHS Foundation Trust

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.