Chipping Ongar Primary School
key details
| Value | £2,200,000 |
|---|---|
| Status | planned |
| Category (CPV) | 45000000 |
| Contract start | 26 Jul 2018 |
| Contract end | 24 Dec 2019 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-47c0cbc4-af76-4f1a-982b-c78d037391d5 |
description
This opportunity relates to the refurbishment of Chipping Ongar Primary School (COPS) as part of the Priority Schools Building Programme Phase 2 (PSBP2). The PSBP2 programme was launched on 1 May 2014 to undertake major rebuilding and refurbishment projects, addressing the needs of schools in poor condition.
COPS is a mixed primary school for ages 4 to 11, situated in Greensted Road, Ongar, CM5 9LA.
The school consists of two main blocks (EFAA and EFAB) of varying forms and types of construction, located to the northern end of the school site. The blocks are interconnected via a glazed atrium. Hard play areas are located to the east, south and west of the main school blocks, and a playing field to the south. The school site has a total area of approximately 6 acres.
The project is to refurbish the existing block EFAA, which has an approximate GIA of 1,410sq/m, in order to achieve the necessary 15 year residual design life applicable to PSBP2 schemes. Block EFAA includes a nursery which is outside of the scope of works. The total funded area for refurbishment represents approximately 1,305sq/m. Block EFAB is outside of the scope of works.
Block EFAA was built circa 50 years ago and features traditional construction with cavity brickwork and full-height window panels with aluminium finish and double glazed window units. The key works for the scheme include, but is not limited to:
| • | Replacement of the flat roof finish |
| • | Renewal of roof drainage system |
| • | Replacement of the majority of window units and repair of retained window units |
| • | Renewal of ceiling finishes |
| • | Replacement of LTHW radiators and fan convectors. |
The works will be completed in a phased manner. Initial proposals negate temporary accommodation blocks, with surplus space within the school being used as temporary classroom space.
One contractor is required to manage and deliver these work. The successful contractor will be appointed under PCSA to finalise design prior to being appointed via a JCT Design & Build Contract. PCSA appointment is anticipated Jul-18. JCT D&B Contract sign is anticipated Apr-19. Works are anticipated to be completed by Dec-19.
The School must remain fully operational for the duration of the works.
Additional information: If you are interested in this tender, please contact Nick Edwards at Turner & Townsend.
The scheme procurement will be administered using the AWARD e-portal. In order to gain access to AWARD, bidders will be required to submit confirmation to the appointed Administrators of AWARD (Turner & Townsend - pm27821@turntown.com) and request login details. Once submitted you will be sent a link to the AWARD log-in page along with a password, which should be changed immediately. An AWARD user guide is included as part of the ITT pack of information, which will be available on AWARD.
documents
- https://www.contractsfinder.service.gov.uk/Notice/abb36ea3-35c9-4d66-90cd-c48fc793b027 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 9 May 2018 | Planning (planning) | · | 20d5ab5e-1dfd-42f9-8a55-1993a3e844b5-215264 |
| 28 Sept 2018 | Tender (tender) | · | abb36ea3-35c9-4d66-90cd-c48fc793b027-243330 |
more from TURNER & TOWNSEND PROJECT MANAGEMENT LIMITED
- East London Science School - Clock Mills Refresh and Refurbishment · £750,000 · 8 Jun 2020
- Turing House Free School Phase 6 Temporary Accommodation · £650,000 · 9 Dec 2019
- Clarendon School Refurbishment 2018 · £250,000 · 19 Apr 2018
- Window Supply and Install for Temporary Free School Project in East London · £40,000 · 26 Mar 2018
- East London Science School - Temporary Accommodation (in two locations) · £550,000 · 22 Feb 2018
- Clarendon School Modular Delivery 2018 · £800,000 · 20 Feb 2018
- Humphry Davy School · £1,030,000 · 15 Jan 2018
- Refurbishment of Brentry Primary School · £2,500,000 · 6 Oct 2017
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Valley Primary School - Partial Roof Replacement · Cumberland Council · £62,775
- CPU 8505 - Construction of a SEND unit at Fernwood Academy School. · Nottingham City Council · £3,064,406
- 25221 - Priorslee Campus - Building M&E Fire Condition Survey - AWARD · Telford and Wrekin Council
- Wokingham Borough Council - EMMBROOK SCHOOL - 6TH FORM · WESTWORKS PROCUREMENT LIMITED · £2,500,000
- C006PC - LCWIP 4 CR East Hill Colchester · Essex County Council · £4,309,571
- PL0085 Dovercourt Public Realm · Essex County Council · £2,394,609
- CWF Lot 1A - Barrow Library Roof · WESTMORLAND AND FURNESS COUNCIL · £340,000
- Construction Framework · MERSEYRAIL ELECTRICS 2002 LIMITED
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.