gvtcx

Enabling Works - Groundworks & Civils

BIP SOLUTIONS LIMITED Published 8 Aug 2022 Contracts Finder

key details

Value£1,000,000
Statuscomplete
Category (CPV) 45200000
Deadline27 May 2022
Contract start4 Jul 2022
Contract end31 Jul 2022
Procedurelimited
SME suitableYes
OCIDocds-b5fd17-3e34aecc-e710-4327-a166-e07c5b17ee58

Award

SupplierValueDateStatus
not named £0 4 Aug 2022 active

description

oSite clearance to Areas A, B & C for the installation of working platforms, haul roads and site welfare including management and disposal of all waste generated from site.
oSurface vegetation clearance (de-veg) to enable access to permanent and temporary works locations.
oRemoval of minor underground obstructions and foundations as required.
oInstallation of ducting, pipework and drainage to and from the welfare facilities for the provision of power / services and removal of waste and foul water.
oInstallation of small concrete bases for site survey control set up works.
oExcavation/trimming of existing ground for installation of working platforms in areas A-C as per attached presentation slides.
oInstallation of Pile mat/crane platform to Areas A, B & C. The subcontractor is to assume 400mm of 6F2 with 2 layers of geogrid.
oInstallation of haul/access roads from the main compound down to the satellite site access following the alignment of the reception line. Existing ballast is to be removed and replaced with a designed haul road. The subcontractor is to assume 300mm of 6F2 with 2 layers of geogrid.
oInstallation of compound hardstand area including foundations for welfare cabins and concrete footpaths. Subcontractor is to assume 2No. units double stacked (2x1x2)

Suppliers will be required to have Constructionline Gold verification.

If shortlisted, suppliers will be required to complete our internal PQQ form.

The bids will be scored with a balanced scorecard approach that includes scoring on experience, resource, sustainability, health & safety, quality, and social value amongst other elements.

VolkerFitzpatrick (VF) is the engineering and construction branch of the VolkerWessels Group, one of the leading engineering and construction companies in the UK. VolkerFitzpatrick have undertaken numerous major infrastructure projects across the UK such as HS2, Wembley Olympic Way, Stansted Airport, Brent Cross West Station and RAF bases Lossiemouth and Lakenheath.

This overall project is working for BBVS JV at the Old Oak Common Station site. VF are undertaking the bridge demolition and replacement for the bridges over Old Oak Common Lane and the Central Line. VF will also be doing the temporary and permanent road lowering at Old Oak Common Lane. The overall programme is 2022-2028, to be done in 3 stages.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
8 Aug 2022 Award (award) · 7d9218c9-d04d-4e94-97d0-dcfb9022fb3c-561210

more from BIP SOLUTIONS LIMITED

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.