gvtcx

Supply Chain Notice: WAT0097 Telehandler Replacement QEC Berth Portsmouth Naval Base

Ministry of Defence Published 14 Jul 2023 Contracts Finder

key details

Statusplanning
Category (CPV) 42415100
RegionSouth East
SME suitableYes
OCIDocds-b5fd17-3be84dd0-91f9-4733-a2bd-93b688209cde

description

Project location

HM Naval Base Portsmouth

The Contractor shall be expected to adhere by the HMNB site security requirements, all Contractors and Sub-Contractors shall be BPSS security vetted and will be required to hold the relevant site security passes.

The Contractor shall be expected to hold the following levels of insurance £10m Public Liability, £10m Product Liability, £5m Professional Indemnity.

KBS Maritime - Introduction

KBS Maritime is a joint venture between KBR and BAE Systems, bringing together two global players with a rich heritage of delivering excellence, innovation and reliability. The joint venture will combine the expertise of KBR as a global leader in infrastructure asset management and services with BAE Systems' experience and capability within Portsmouth Naval Base. KBS Maritime are delivering an ambitious, modern and enduring change to the Portsmouth Naval base infrastructure, securing investment in the local community and ensuring fit-for-purpose, world-leading fleet support for the Royal Navy and the UK in the decades ahead.

Project Background

KBS Maritime have a requirement to replace 4 telehandlers which have reached the end of their life with new assets to support the future operations of the Naval Base. These will potentially be purchased 2 in the current year financial year (end 31/03/24) and 2 in the following year (end 31/03/25)

Supply 4 x telehandler with maximum lift capability within the below constraints.

  1. Shall be capable of running on HVO and diesel fuel
  2. Shall comply with JSP 482 and JSP 467 to enable telehandlers to be used for transporting explosive materials.
  3. Shall be rotary design
  4. Minimum reach of telescopic boom 32m
  5. Minimum lifting weight at fully extended boom 250kg
  6. Maximum axel weight of 16.5 tons (driving Weight)
  7. Maximum vehicle weight (2 x axel Vehicle) 33 tons
  8. Paint finish shall be corrosion resistant to give extended protection in marine environment operating area.
  9. Shall be capable of operation from remote control unit.
  10. Cab shall include cameras to aid operator visibility of load being lifted.
  11. All equipment shall be tested by manufacturer prior to delivery. Documented evidence of testing shall be provided as well as the Declaration of Conformity and LOLER certificate
  12. The supplier shall undertake training of operation and maintenance staff including operator familiarisation and maintainer training

Additional equipment

  1. A set of ground pads to reduce ground load to less than 10 ton/sqm
  2. Fixed lifting Hook
  3. Set of lifting folks
  4. Winch

Approximate Value per Telehandler is £430k. Total for 4 off : £1.7m

KBS Goods Supply Contract will be applicable to this project (this will be made available at ITT stage)

Additional information:

: If you are interested in this opportunity, please contact KBS Maritime at Tenders@kbsmaritime.com quoting - WAT0097 Telehandler Replacement QEC Berth Portsmouth Naval Base in the email subject title to express interest.

Once the notice has closed, suppliers will be invited to Pre-Qualify and/or Invited to Tender. Open or restricted tender procedure will be dependent on the number of expressions of interest received.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
14 Jul 2023 Planning (planning) · 857f96e9-4208-4219-8d9a-ca8f7d704869-662846

more from Ministry of Defence

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.