T0238 M53 Clatterbridge Half Joint Calculation Review

Highways England Published 13 Jan 2022 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£24,924
Statuscomplete
Category (CPV) 73000000
RegionSouth East
Deadline2 Dec 2021
Contract start22 Dec 2021
Contract end31 Mar 2022
Procedureselective
SME suitableYes
OCIDocds-b5fd17-3b1e850b-0a4d-4093-b653-988f4c814277

Award

SupplierValueDateStatus
WSP UK Ltd £24,924 22 Dec 2021 active

description

National Highways (NH) has Hidden Critical Defects amongst its structures stock on the Strategic Road Network (SRN). Half Joint bridge construction is one such detail that is known to cause concern and is part of a national programme of Half Joint assessments aimed at understanding their condition and contribution to limiting capacity.

Ideally, the assessment will confirm that the HJ bridge capacity in its as-built condition is adequate for the route capacity. Where necessary, consider condition factors associated with a bridge, several decades old.

In Area10 on the M53, Clatterbridge Bridges, an interchange junction, have been assessed by NH's Design Services Contractor, Amey. The uncertified capacity is indicating a capacity less than expected based on results achieved on similar bridges with similar design on that route. That is affecting how the bridge is managed and monitored.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
13 Jan 2022 Award (award) · 659dbcf4-3bb3-4ce5-a963-7b935c4587d8-500399

more from Highways England

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.