gvtcx

Roofing Structures Condition Survey, Science Museum, London

Science Museum Group Published 19 Jun 2020 Contracts Finder

key details

Value£12,750
Statuscomplete
Category (CPV) 71315300 +2 more
RegionLondon
Deadline18 Apr 2019
Contract start18 Apr 2019
Contract end31 May 2019
Procedureopen
SME suitableYes
OCIDocds-b5fd17-660f9533-056f-42b4-8f43-8592334c86a2

Award

SupplierValueDateStatus
The Concrete And Corrosion Consultancy Practice £12,750 16 Jun 2019 active

description

The Science Museum building in South Kensington has expanded over a number of years and with each expansion differing methods of roof construction have been utilised. Following a recent redevelopment of levels 4 and 5 of the museum and water ingress issues that were encountered when building from, or connecting to the existing roof structures, the estate department would like to get a better understanding of the current condition and expected lifespan of the existing structures and coverings.

A lump-sum quotation is requested to carry out a full Condition Survey of the roofing elements of the Science Museum London that adheres to the SMG Condition Survey Suite of Documents. Focus is to be on the following objectives:

  • A detailed report on the composition of the various roofing structures, their condition to determine the current state and expected remaining life.
  • It will provide remedial repair suggestions prioritising and outline immediate repairs to develop understanding of any urgent works that could pose a threat to persons or collections inside and within close proximity to the building.
  • The document will detail the locations and current state of rain water drainage outlets/collection points at the point where they interface with the roofing structure.
  • It will identify areas of the roof that are currently inaccessible and make recommendations for the installation of safe access systems that will allow for PPM and repair tasks to be carried out safely.
  • CAD plans will be developed from the Condition Survey which follows the Guidance Document for CAD Standard (SMG 0004/1:2018). They are to update the existing plans of the roof, detailing where roof structures change and the location of rainwater outlets to aid estate department PPM duties.
  • A written summary of condition based on SMG 0005/1:2018 - Written Report Template

Inclusions - The appointed lead consultant's sub-surveyors will include the following:

-Concrete specialist
-Metallurgist
-QS
-Structural Engineer

Exclusions - The following is not required as part of this work:

  • RIBA Stages 3-6.
  • No remedial repair works will be undertaken as part of the survey.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
19 Mar 2019 Tender (tender) · 0d8ef869-d8e0-4ddf-9540-c9d098f8b245-277032
19 Jun 2020 Award (award) · 63e3be41-95e5-46ec-85cd-2853c58a0ea5-365390

more from Science Museum Group

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.