WAT0042-04 - 1 Basin Caisson - Cofferdam, Masonry Repairs, Installation
key details
| Value | £3,000,000 |
|---|---|
| Status | active |
| Category (CPV) | 45244000 +2 more |
| Region | South East |
| Deadline | 28 Jun 2024 |
| Contract start | 31 Jan 2025 |
| Contract end | 24 Feb 2027 |
| Procedure | selective |
| SME suitable | No |
| OCID | ocds-b5fd17-3002c4f1-0c30-4f8b-9bed-0692c7e53645 |
description
The Tenderer should be aware that the works detailed in this package are constrained due to the nature of the location they are to be conducted in.
Project location
HM Naval Base Portsmouth
The Contractor shall be expected to adhere by the HMNB site security requirements, all Contractors and Sub-Contractors shall be BPSS security vetted and will be required to hold the relevant site security passes.
The Contractor shall be expected to hold the following levels of insurance £10m Public Liability, £10m Product Liability, £5m Professional Indemnity.
KBS Maritime - Introduction
KBS Maritime is a joint venture between KBR and BAE Systems, bringing together two global players with a rich heritage of delivering excellence, innovation and reliability. The joint venture will combine the expertise of KBR as a global leader in infrastructure asset management and services with BAE Systems' experience and capability within Portsmouth Naval Base. KBS Maritime are delivering an ambitious, modern and enduring change to the Portsmouth Naval base infrastructure, securing investment in the local community and ensuring fit-for-purpose, world-leading fleet support for the Royal Navy and the UK in the decades ahead.
Project Background
Proposed to replace the existing caisson to 1 Basin. Proposed works to be undertaken as per the design and surveys approved with Historic England and Crown Estates.
Install perimeter CPNI fencing to secure the site for the duration of the project.
Installation of temporary cofferdams to the East and West that will not impact the historic fabric. Dewater and inspect and survey the 1 Basin stonework.
Monitor historic seawalls and ground water levels during the works.
Undertake stone wall repairs in accordance with Historic England detail specification and approval.
Replace the penstock gate with electric operated replacement with civil works and electrical supply required to operate.
Demolition and removal of the existing caisson constructure to 1 Basin. Repairs to the caisson groove and prepare for replacement caisson arrival (by others) removal all structural supports.
Remove and survey the condition of the road bridge. Repair works to the sill and stone repairs to match the existing structure to the detailed specifications to Historic England specification. Install a temporary foot bridge during the project.
Refurbishment and load testing of fairleads and bollards and leave in full working order for ongoing operations. Clean, survey and remedial repairs to historic brickwork culvert after dewatering.
Remove the temporary cofferdams and refit road bridge after caisson has been replaced and all works to the bridge has been completed.
Additional information:
If you are interested in this opportunity, please express an interest through KBS' tendering portal to access the Selection Questionnaire and NDA; https://uk.eu-supply.com/ctm/supplier/publictenders?B=KBS
Send form to: DefComrclSSM-Suppliers@mod.gov.uk
documents
- https://www.contractsfinder.service.gov.uk/Notice/cb51fd19-4d8d-4016-a032-ee045030a2d5 , tenderNotice
- https://www.contractsfinder.service.gov.uk/notice/d49d5b0d-ff9c-4cd6-a35b-8b2bb644583a?origin=SearchResults&p=1
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 25 Jun 2024 | Tender (tender) | · | cb51fd19-4d8d-4016-a032-ee045030a2d5-761889 |
more from Ministry of Defence
- TTHC/0017 Torpedoes Repair and Maintenance (TRAM) · £405,762,737 · 29 Jul 2026
- 713107450 In Service Support of Type 45, Integrated Navigation and Bridge System Award notice · £9,888,089 · 28 Jul 2026
- SUPPLY CHAIN NOTICE - Calibration Services For Tooling Supporting Boeing, Vertical Lift Helicopters. · £12,000 · 28 Jul 2026
- SUPPLY CHAIN NOTICE - WC1996767 - (MT0019, MT0106, MT0265, MT0494) - Remedial works required to M&T Structures from the PAs, Akrotiri & Dhekelia, CYPRUS · 28 Jul 2026
- 715878489 - MCF 4 Order Form · £1,082,000 · 28 Jul 2026
- Provision of Foreign Currency SUpply to 2028 · £800,000,000 · 28 Jul 2026
- 704461451-MSS/141-SPA707 - CAN · £1 · 28 Jul 2026
- External Legal Support for FMSP Extensions · £450,000 · 27 Jul 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- SE - AOMR - Elmer Navigation Beacon Works · Environment Agency · £149,000
- New pontoons and brow at Denton · Port of London Authority
- Tender for a Construction Team to Design and Build a Marine Stop Wall and Associated Works in Canning Dock (Liverpool Waterfront) for National Museums Liverpool - AWARD · National Museums Liverpool · £2,750,000
- New South Pier Repair Works · Sunderland City Council · £688,820
- Fountain Lake Jetty TSP CAN · Ministry of Defence · £2,370,734
- Colemans Floating Pontoon Project - AWARD · East Suffolk Council
- Hendon Foreshore Barrier Works · Sunderland City Council · £1,279,320
- Lochmaddy Pier Improvement Programme Main Works · Comhairle nan Eilean Siar · £15,301,496
source