gvtcx

T0261 Management of Fatigue in Steel Bridges

Highways England Published 5 Apr 2022 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£180,009
Statuscomplete
Category (CPV) 73000000
RegionNorth East
Deadline31 Jan 2022
Contract start1 Apr 2022
Contract end31 Mar 2023
Procedureselective
SME suitableNo
OCIDocds-b5fd17-2e5daa75-fb4f-417a-886a-eac6d2bdb5cd

Award

SupplierValueDateStatus
Arup £180,009 31 Mar 2022 active

description

National Highways is responsible for the maintenance and operation of 1475 bridges constructed with a steel primary deck element. A large percentage of these structures were designed before the publication of the design code for fatigue BS 5400 part 10 and therefore may contain components with a fatigue life less than the design life of the structure.

The objective of the client is to produce a standard which takes a risk based approach to the management of fatigue in steel bridges. This will have the aim of proactively managing bridges at risk of developing fatigue, rather that reactive.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
5 Apr 2022 Award (award) · f6dc040a-a8a5-4e67-9ba1-4f36ad3d4774-525372

more from Highways England

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.