Temporary Electrics, Water and Site Services (WP39.1) - Old Oak Common (S4) Station - HS2

BIP SOLUTIONS LIMITED Published 27 Jul 2021 Contracts Finder

key details

Value£1,000,000
Statuscomplete
Category (CPV) 31600000 +6 more
RegionLondon
Deadline11 Aug 2021
Contract start19 Jan 2022
Contract end30 Nov 2029
Procedurelimited
SME suitableYes
OCIDocds-b5fd17-2e0ae54f-2d34-46e2-893b-46998a3a74d6

Award

SupplierValueDateStatus
not named £0 28 Jul 2022 active

description

Temporary Electrics, Water and Site Services

WP39.1 scope consists of the design, supply, installation and site testing of all additional temporary electrics, water and other site services required during the constructions of the whole project which includes HS2 and GWML stations plus Shared Accommodation Building (SAB) at Old Oak Common Station.

All works to be as required during the construction and commissioning and comply fully with the Standards and Guidance documents, as identified in its section 5. Particularly HS2 standards and British Standards 7671:2018 and 7430 2011.

Scope of works will include:-

Relocation of HV Transformers, Main Distribution Units (MDUs) and HV Cabling
Control of switching for HV supplies
Relocation of LV MDUs and cabling
Installation of temporary lighting
Relocation and supply of additional Road lighting
Relocation and supply of additional 110V Transformers, cabling, and socket boxes
Modify existing, supply and Installation of new MDUs
Modification of existing, supply and Installation of new vehicle changing units
Re-cabling tower cranes and plant power supplies and lightning suppression units as they are moved to suit the project programme
Progressive removal of electrical installation at completion of the project
Installation of additional vehicle and plant changing points
Periodic electrical testing for BS7671 and PAT requirements
Relocation, adjustment, and additional site 200mm and 80mm water mains, including values, chambers, and meters
Relocation of Hydrant mains and Hydrants
Modifications to site over pumping and power supplies
Additional temporary fire mains within the construction project
Installation of standpipes
Disinfection of water pipework
Modifications to site WIFI systems
Modifications to site wide BMS electric and Water meter connections
Changes to the site drainage systems
Maintain and relocation of site ventilation system
Relocation and powering of wheel wash and weight bridge

The subcontractor is to develop designs to include the installation processes, commissioning, testing and maintain a detailed set of drawings plus operation and maintenance manuals for the temporary installation.

Liaison with BBVS, WSP (main designers) and other Subcontractors will be required in the all works area.

Contract will be NEC3 ECC Option E

Additional information: No Documentation is included at this point.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
10 Aug 2022 Award (award) · 73c89e57-6fee-45ec-bdbe-80a5940722e6-562425

more from BIP SOLUTIONS LIMITED

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.