Replacement Lift within Ward Four (4) at Glangwili General Hospital (GGH)

key details

Value£234,000
Statuscomplete
Category (CPV) 45313100 +2 more
RegionWales
Deadline8 Nov 2024
Procedureopen
OCIDocds-h6vhtk-04a73b

Award

SupplierValueDateStatus
KONE PUBLIC LIMITED COMPANY · · active

description

Hywel Dda University Health Board (HDUHB) have a requirenment to replace the existing lift within ward four (4) at Glangwili General Hospital (GGH).

The works required are comprised of the dismantling and removal of the existing lift equipment, followed by the design, manufacture, supply, construction, installation, and commissioning of one (1) traction machine-room-less (MRL) stretcher passenger lift enhanced with bed passenger lift features.

The requirement shall be in place for one (1) year and five (5) months which includes a twelve (12) month warranty / maintenance period following the successful installation and handover of the new lift. Upon the conclusion of this maintenance period, the All-Wales lift maintenance provider will complete an inspection of the lift and absorb it into its contract portfolio.

Scope of the Contract

HDUHB are seeking to appoint a suitably qualified lift supplier to facilitate the replacement of the vertical transportation (VT) unit at GGH. The VT system must comprise of the following:

  • A simplex, 20 persons / 1500kg Traction MRL Trolley / Stretcher Lift with a rated speed of 1.0m/s, spanning 4 levels which shall be designed, manufactured and installed in compliance with the requirements of Welsh Health Technical Memorandum (WHTM): Lifts (WHTM08-02: 2017) where existing design constraints allow.
  • The existing lift is used to carry hospital beds. Its current dimensions are larger than the WHTM definition of a Trolley / Stretcher Lift. The New Lift will need to meet the existing dimensions and duty load as a minimum. For this reason, some features of the WHTM Bed lift specification will be necessary and incorporated into the design specification.
  • The hospital site operates entirely on essential power. This means the supply power to the lift will be fed from a generator periodically. The supplier should allow for this in their design submission.

The Lift Contractor shall ensure that the design, manufacture, construction and installation of the lifts is undertaken in full compliance with the requirements of the Lifts Regulations 2016.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
9 Oct 2024 Contract notice (F02) Earlier regulations 032466-2024
10 Feb 2025 Contract award notice (F03) Earlier regulations 004354-2025

more from NHS Wales Shared Services Partnership-Procurement Services (hosted by Velindre University NHS Trust)

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Sell2Wales. Contact details for named individuals are not reproduced on this site.