Sustainable Urban Drainage System Feasibility Study and Design
key details
| Category (CPV) | 44163112 +9 more |
|---|---|
| OCID | ocds-kuma6s-128282 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| The Environmental Protection Group Ltd | · | · | · |
description
An award has been made by Neath Port Talbot Council for the following:-CONTRACT REQUIREMENTS:-It is the expectation of the chosen consultant to carry out a feasibility study to retrofit suitable Sustainable Urban Drainage Systems (SuDS) in Neath and as a result of the study, to designSuDS features which will incorporate vascular plants, trees and shrubs.We are looking to pilot these SuDS schemes on 3 streets located in the town of Neath with a view to dealing with excess rain water run offs as well as helping reduce the impact of air pollution in the centre of the town. This ‘pilot’ design could potentially inform future retrofitted highway SuDS within Neath Port Talbot County Borough and should therefore be easily replicable.The contractor will be required to complete the works following the elements described below:Working closely with the Green Infrastructure and Biodiversity team, the contractor will1. Carry out a feasibility study and formulate a detailed design for 3 streets in Neath.This will include the redesigning of the entire street. Exact locations to be agreed with council staff during inception meeting. Please note that the targeted ‘pilot’ streets include traditional Victorian terrace houses (for example: Gnoll Drive, Neath SA113TH) and this needs to be considered as part of the design.2. Provide a detailed design for the retrofitting of surface located SuDS features based on bio retention “rain gardens” within the highway using suitable load bearing mediums3. Include the maximum possible surface SuDS features for each street dependent on utilities and other constraints.4. Design SuDS features to include soft landscaping where appropriate; namely the use of vascular plants where appropriate as well as many trees and shrubs as feasible within each street5. Incorporate a design to take into consideration highway SuDS build outs for traffic calming measures as well as taking into consideration provision for resident parking.This will include the use of load bearing soil mediums in order to maximise soil volume within the highway.6. Ensure the designs include as many permeable surfaces as possible7. Include photo realistic CGI of proposed SuDS interventions within project street scape.DELIVERABLES:-The contractor will be expected to provide:- A report on the feasibility study to retrofit SuDS within the agreed locations along with,- Detailed technical drawings of the proposed SuDS for the 3 selected streets based on the project brief outlined above
more from Neath Port Talbot County Borough Council
- GB-Neath Abbey: TPPL Neath Port Talbot County Borough Council NEPO HGV Lot 1 - 6 x Refuse Collection Vehicles (29266) · £1,862,286 · 27 Mar 2026
- GB-Neath Abbey: TPPL Neath Port Talbot County Borough Council NEPO HGV Lot 1 - 3 x Narrow Chassis Refuse Collection Vehicles (28765) · £733,062 · 13 Mar 2026
- Dynamic Purchasing System (DPS) for Passenger Transport Services in Neath Port Talbot (Contract Awards: 01.10.25 - 31.12.25) · £987,295 · 30 Jan 2026
- ‘Nature’s back in town’ Project · 13 Nov 2025
- Natures Wardens - Green Roof Structure · 6 Nov 2025
- GB-Neath Abbey: TPPL Neath Port Talbot County Borough Council NEPO HGV Lot 2 - 21 x Recycling Vehicles (25226) · £7,143,500 · 3 Nov 2025
- 'Nature's Back in Town' Project - Design Feasibility · 3 Nov 2025
- Dynamic Purchasing System (DPS) for Passenger Transport Services in Neath Port Talbot (Contract Awards: 01.06.25 - 30.09.25) · £7,954,765 · 31 Oct 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Award of 5465 – Libanus Primary School – Drainage Works · Caerphilly County Borough Council · £27,000
- NUN - Drainage Maintenance 26/29 · Nuneaton and Bedworth Borough Council · £1,250,000
- Framework Agreement for the provision of Drainage, Jet Washing and Interceptor Waste Disposal Services at SCC owned Household Waste Recycling Centres · Staffordshire County Council · £640,000
- Sustainable Drainage Systems (SuDS) in Schools Project · London Borough of Lewisham
- VIVID Old Barn Close Drainage Works · VIVID · £28,200
- DPS Call Off - Provision of Tree Pit / SuDS Design & Supply · BLACKPOOL COUNCIL
- B915 - Nantymoel Tip Drainage Channel Remediation · Bridgend County Borough Council
- Kneeton Close, Mapperley Flood Alleviation Works. - AWARD · Gedling Borough Council
source
Published on Sell2Wales. Contact details for named individuals are not reproduced on this site.