REPLACEMENT DISABLED ACCESS LIFT FOR SV GLENLEE (THE TALL SHIP GLENLEE)
key details
| Value | £70,000 |
|---|---|
| Status | complete |
| Category (CPV) | 42416100 +5 more |
| Region | Scotland |
| Deadline | 16 Jan 2026 |
| Procedure | open |
| OCID | ocds-h6vhtk-05f7ca |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Saltire Lifts LTD | · | · | active |
description
The historic vessel, The Tall Ship Glenlee requires a replacement accessibility lift to be purchased and installed using funds from Museums Galleries Scotland Repair and Adaptation Fund.
Contractor turnkey project requirement definition:-
| 1. | Lift as presently configured with four access/ egress levels in weather deckhouse, ‘tween decks, mezzanine deck, hold, DDA compliant. |
| 2. | Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons. |
| 3. | Power – single phase 220 V AC. |
| 4. | Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship. |
| 5. | Does not need to meet fire evacuation requirements. |
| 6. | Design must accommodate the limited pit depth of <150mm. |
| 7. | Meet or exceed 2006/42CE. |
| 8. | All works must comply with CDM regs. |
| 9. | Lift must be capable of a minimum of 20 operational cycles per hour. |
| 10. | Normal duty cycle is 8 hours per day with some operational days of up to 24 hours per day. |
| 11. | A five-year warranty on all parts and labour/ hours is required. |
| 12. | A five-year maintenance package is required. |
| 13. | A key control is required to avoid unauthorised operations. |
| 14. | Turnkey project for removal of all components of old lift installation and installation and commissioning of new lift. |
| 15. | All responsibility for measurements, design, removal of old equipment and materials arisings from site. |
| 16. | All transportation of equipment and materials, lifting and craneage are part of the turnkey contract. |
| 17. | All works must comply with relevant Health and Safety at Work Act requirements. |
| 18. | Insurance must be provided for a sum of GBP 10 million pounds for any one occurrence. |
| 19. | Product liability insurance in the sum of GBP 10 million pounds in the aggregate and professional indemnity insurance in the aggregate. |
Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.
documents
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
3 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 17 Dec 2025 | Contract notice (F02) | Earlier regulations | 083806-2025 |
| 15 Jan 2026 | Corrigendum (F14) | Earlier regulations | 003536-2026 |
| 10 Feb 2026 | Contract award notice (F03) | Earlier regulations | 011908-2026 |
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PL Replacement lift at Peterborough Museum and Art Gallery · Peterborough City Council · £140,000
- For the Provision of: Passenger Lifts Service and Maintenance · First Choice Homes Oldham · £40,000
- Passenger Lifts · Places for People Group Limited
- Provision of Servicing of Passenger and Commercial Lifts · City of York Council · £460,000
- HAR6152: Mobility Aids - Lifts · Tower Hamlets · £740,000
- Passenger Lift Servicing and Repairs - Leeds Building Services · Leeds City Council · £99,000
- TD2358 - Museum & Art Gallery Refurbishment of the existing passenger lift · Derby City Council · £130,000
- TD2357 - Council House Refurbishment of two existing passenger lifts (2 & 3) · Derby City Council · £260,000
source
Published on Public Contracts Scotland. Contact details for named individuals are not reproduced on this site.