Design Team for Fyvie Castle & Estate Major Conservation Project
key details
| Status | complete |
|---|---|
| Category (CPV) | 71220000 |
| Region | Scotland |
| Deadline | 1 May 2024 |
| Procedure | open |
| OCID | ocds-h6vhtk-044ea3 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Page \ Park Limited | · | · | active |
description
The purpose of this tender is to appoint a design team to support the Fyvie Castle & Estate Major Conservation Project being run by the National Trust for Scotland.
documents
- Design Team for Fyvie Castle & Estate Major Conservation Project ITT
- Appendix A Drawing 9 South Elevation
- Appendix A Drawing 10 West Elevation
- Appendix A Drawing 11 Sections
- Appendix A Drawing 12 Sections 02
- Appendix A Drawing 13 Section Plan and Unwrapped Elevation
- Appendix A Racquets Court Plans 1-50 A1
- Appendix A Racquets Court Sections 1-50 A2
- Appendix A Racquets Court Elevs 1050 A1
- Appendix A Game Larder
- Appendix A Earth Closet
- Appendix A Drawing 1 Ground Floor Plan
- Appendix A Toilet Block
- Appendix A Garden Store
- Appendix A Old Home Farm Site
- Appendix A Old Home Farm Plans
- Appendix A Old Home Farm Long Roof Elevs
- Appendix A Old Home Farm Elevs
- Appendix A Old Home Farm Key Plan
- Appendix A Boat House
- Appendix A Walled Garden Site Plan
- Appendix B Fyvie Ownership Site Plan
- Appendix A Drawing 2 First Floor Plan
- Appendix C Fyvie Statement of Significance
- Appendix D Fyvie Conservation Statement
- Appendix E Seton Tower Structural Report
- Appendix F Proposed Structural Monitoring
- Appendix G Castle Structural Observations
- Appendix H M and E Condition Report
- Appendix I Stone Conditions Report
- Appendix J Assessment of Roughcast Finishes
- Appendix K General Structural Report Old Home Farm
- Appendix L Old Home Farm Conservation Statement
- Appendix A Drawing 3 Second Floor Plan
- Appendix M Fyvie Castle Condition Survey
- Appendix M Conditions Survey Appendices
- Appendix M Old Home Farm Condition Survey
- Appendix M Old Home Farm Photo Appendix
- Appendix M Old Home Farm Building ID
- Appendix N Fyvie Masterplan
- Appendix O Accessibility Consultant
- Appendix O Architect Scope of Services
- Appendix O C and S Scope of Services
- Appendix O Fire Engineer
- Appendix A Drawing 4 Third Floor Plan
- Appendix O Lead Designer
- Appendix O M and E Scope of Services
- Appendix F Proposed Structural Monitoring
- Appendix J Assessment of Roughcast Finishes
- Appendix K General Structural Report Old Home Farm
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 29 Mar 2024 | Contract notice (F02) | Earlier regulations | 010463-2024 |
| 29 Aug 2024 | Contract award notice (F03) | Earlier regulations | 027514-2024 |
more from National Trust for Scotland
- St Kilda Church Works (2026-27) · 24 Jul 2026
- Proposed Conservation Repairs at Leishman Centre Glencoe · 10 Jul 2026
- Ben Lomond Hill Fence Works · 7 Jul 2026
- Project Management · 15 Jun 2026
- Hill of Tarvit Mansion & Garden, Steel Fire Escape Stairs & Stone Wall Repairs · 9 Jun 2026
- Quantity Surveyor for Glenfinnan Visitor Centre · 2 Jun 2026
- Porters Lodge Renovation and Extension at Mar Lodge · 20 May 2026
- Deer Fence Works at Ben Lawers, Morenish Head Dyke · 22 Apr 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Award of Direct Award-26CP027-QEUH-QEUH Emergency Department Redesign-Lead Consultant · NHS Greater Glasgow and Clyde · £19,942
- Oxford - Architect Services · NETWORK RAIL INFRASTRUCTURE LIMITED · £1,900,000
- New Museum Project - Deep Time Gallery: Exhibition Lead Designer · London Museum · £300,000
- Design Lead for Linwood School Satellite Expansion · Bournemouth, Christchurch and Poole Council · £300,000
- Sleep Studies and LTV - Design · Chelsea and Westminster Hospital NHS Foundation Trust
- Mechanical and Electrical Services Stage 4 Design in relation to Theatre 5 and Theatre 6 located on Level 5 at Chelsea and Westminster Hospital. · Chelsea and Westminster Hospital NHS Foundation Trust · £150,156
- Wawne Road Hull - EA · THIRTEEN HOUSING GROUP LIMITED · £51,870
- Gamma Camera - Architect · Guy's and St Thomas' NHS Foundation Trust · £42,209
source
Published on Public Contracts Scotland. Contact details for named individuals are not reproduced on this site.