gvtcx

Laboratory Medicine Building Queen Elizabeth University Hospital Campus Obsolete BEMS Replacement – Phase 2

NHS Greater Glasgow and Clyde Published 21 Apr 2023 Public Contracts Scotland

key details

Statuscomplete
Category (CPV) 75111200 +1 more
RegionScotland
Procedurelimited
OCIDocds-h6vhtk-038abd

Award

SupplierValueDateStatus
Schneider Electric · · active

description

NHS GG&C require the Building Energy Management System (BEMS) at Laboratory Medicine Building Queen Elizabeth University Hospital Campus to be upgraded to meet the criteria detailed with the BRE Energy Management and Building Controls briefing paper. This means that a full ’turnkey’ project encompassing a fully designed, supplied, installed and commissioning of the project is

needing to be delivered. The project will upgrade the existing control installation including the design of revised control strategies, supply and installation of new controls panels along with all required sensors, hardware & software to allow the BEMS to be a managed protocol, remotely accessible system which meets the full criteria of “Class A” of the BRE paper is required. This will need to be completed by End March 2024 to meet financial deadlines imposed by the Scottish Government.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

3 notices published against this procurement.

PublishedTypeRegimeNotice
5 Dec 2022 Voluntary ex-ante transparency (F15) Earlier regulations 034382-2022
18 Jan 2023 Contract award notice (F03) Earlier regulations 001586-2023
21 Apr 2023 Contract award notice (F03) Earlier regulations 011495-2023

more from NHS Greater Glasgow and Clyde

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Public Contracts Scotland. Contact details for named individuals are not reproduced on this site.