gvtcx

CAS-01336-R8D9H5 - GARAGE BLOCK Flats 1-12 Gablehurst, Upton, Poole, BH16 5JA - Roofline Renewal

ASTER GROUP LIMITED Published 31 Jul 2026 Find a Tender

key details

Value£73,440 (£88,128 inc. VAT)
Statuscomplete
Procedurelimited
OCIDocds-h6vhtk-06d848

Award

SupplierValueDateStatus
SPR Roofing Contractors Ltd · · active

description

Project: The refurbishment of the main hipped roof

  • NB: All roofing work to be carried out by an NFRC accredited contractor & must be able to self-certify via the competent roofing scheme.
  • As part of contractor pre-survey, contractor should identity any soffit and live extractor fan vents which will need to be disconnected and reconnected during works
  • Temporarily close off working areas to exclude vehicles and pedestrians from the site using suitable signage and remove them upon the re-opening on completion of the works.
  • Provide scaffolding/staging as required to the properties to enable safe access to undertake all works outlined within the schedule in accordance with Working at Height Regs. 2005. All scaffolding is to be erected, managed and dismantled in accordance with guidance of NASC - SG4 and Design should be in accordance with NASC - TG20:21.
  • Allow to remove existing roof covering in accordance with current asbestos management guidelines clearing all resultant debris from working area before starting to build and fix the ladders, fit the deck and install new plastics as per the pricing document

Page 5 of 15

  • The contractor shall review the asbestos R&D supplied and manage a

specialist asbestos removals contractor to undertake the removal and disposal of any hazardous waste material.

  • Ensure that the removal of the existing roof covering including ACM sheets and all plastics inc guttering is compliant with current regulations.

The removals contractor must have UKATA/IATP training qualifications for any unlicensed removals and provide consignment note upon completion of works.

  • Make and supply “ladders” fitted over concrete beams to provide fall of at least 5 degrees to the rear of the garages
  • Remove the all existing, soffits, facia and guttering including any associated fixtures and install the deck or waterproof covering with associated fixtures & fittings
  • Install new fascia around the building to conceal the roof ladders as well deepflow gutter with appropriate clips and fittings to the rear. Also supply and fit appropriate downpipe, with appropriate clips and fittings, to the rear of the property with a minimum 2 down pipes and all clips to be a maximum 1 metre apart

more from ASTER GROUP LIMITED

all contracts from this buyer →

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.