NRW All Wales Mountain Bike Trail and Maintenance Framework
key details
| Value | £2,000,000 (£2,400,000 inc. VAT) |
|---|---|
| Status | planned |
| Category (CPV) | 45236290 +1 more |
| Region | Wales |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-h6vhtk-06ba93 |
description
NRW intends to award a Framework Agreement to support the maintenance of over 500km official NRW mountain bike trails across Wales. The Framework contains two separate Lots, each divided further into geographical sub-Lots.
Lot 1 – Mountain Bike Trail Maintenance Works
Lot 1 covers the preventative and reactive maintenance activities identified through the regular trail inspection programme. The specification of works includes, but is not limited to:
| • | Maintenance of mountain bike trail tread, trail chassis and trailside features, including de-berming, culvert repairs, ditch clearance, grade dip repairs, and repairs to trail tread and chassis using hand tools, whacker plates, powered wheelbarrows and other plant and equipment as required. This also includes clearance of fall zones and maintenance of the wider trail corridor. |
| • | Maintenance of trail corridors and sightlines through vegetation management, including cutting back encroaching vegetation and brashing trailside trees flush to the trunk. |
| • | Small-scale installation, maintenance and repair of fencing and motorcycle barriers. Detailed specifications for all works will be agreed in advance between the Contractor and the Lot Manager. |
| • | Installation, maintenance and replacement of waymarker posts, interpretation panels, signage and other associated trailside infrastructure. |
| • | Small-scale chemical treatment and manual control of weeds and invasive species within car parks and along trail networks. Chemical use must be kept to a minimum, with manual clearance being the preferred method wherever practicable. Written approval from the Project Manager must be obtained prior to any chemical application, including approval of the products to be used and the proposed application method. Chemical usage records and data sheets must be provided by the Contractor following completion of spraying activities. |
| • | Emergency call-out works, including outside normal working hours (09:00–17:00, Monday to Friday), for repairs, maintenance activities, route diversions and other urgent operational requirements. |
Lot 2 – Mountain Bike Trail Design and Construction
Lot 2 covers the design and construction of new mountain bike trails and trail sections to the grades specified by the Client. Detailed project-specific requirements will be provided for each commission; however, the scope is expected to include:
| • | Detailed trail design. |
| • | Securing all necessary permissions, approvals, consents and licences required for project delivery. |
| • | Corridor clearance and construction of trails to the specification and grading requirements defined by the Client. |
| • | Testing, commissioning and certification that the completed works are fit for purpose. |
| • | Formal handover of completed trails and associated documentation to the Client. |
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 23 Jun 2026 | Pipeline notice (UK1) | Procurement Act 2023 | 058736-2026 |
more from Natural Resources Wales
- Call-off Contract from NRW61768 - Orthorectification Framework 2026-2030 · £27,000 · 28 Jul 2026
- Call off - Peatlands Restoration Framework 2026-2034 - Lot 2 · £43,450 · 28 Jul 2026
- NRW First Aid Training Framework 2026 · £250,000 · 23 Jul 2026
- Crindau Pill Capping Beams Remediation - concrete wall repair and replacement · £151,074 · 23 Jul 2026
- Specialist Analytical Services for Natural Resources Wales · £600,000 · 21 Jul 2026
- New Parking Barrier & Counting System at Newborough · 17 Jul 2026
- NRW Supplementary Plant Supply Framework - Mini Competition 2026 · 13 Jul 2026
- Assessing the likely impact of sand wave clearance on near bed sediment transport through numerical modelling · 10 Jul 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- GS162 - Lightwoods Park Play Area Project - AWARD · Sandwell Metropolitan Borough Council
- WP4024 Swannies Field Regeneration Project · Walsall Metro Borough Council · £93,000
- GS145 - Sandwell Valley Adventure Play area - Part 2 - AWARD · Sandwell Metropolitan Borough Council
- GS139 - Ridding Mound Toddler Play Area Project - AWARD · Sandwell Metropolitan Borough Council
- GS142 - Friar Park Play Area Project - AWARD · Sandwell Metropolitan Borough Council
- GS141 - Oakwood Park Play Project - AWARD · Sandwell Metropolitan Borough Council
- GS129 - Jubilee Park Play Project - AWARD · Sandwell Metropolitan Borough Council
- GS127 - Montague Rd Smk - Play Area Project - AWARD · Sandwell Metropolitan Borough Council
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.