Health Security Campus Pillar 2E: Design Partner (Main Site)
key details
| Status | planned |
|---|---|
| Category (CPV) | 71220000 |
| Procedure | selective |
| OCID | ocds-h6vhtk-06a24f |
description
Update: Since publication it has been decided that the most advantageous route to market will be to procure this requirement via the CCS DPS Construction Professional Services RM6242. As a result this requirement will be going via a PCR15 procedure.
The Design Partner (DP) for Pillar 2E will provide multi?disciplinary design services for the main site buildings and wider campus infrastructure within the UKHSA Health Security Campus programme. While the specialist CL4 facility (H50) is being designed under Pillar 2D, the 2E Design Partner is responsible for the wider estatecovering laboratories, office accommodation, shared facilities, campus utilities, infrastructure, and supporting buildings across the main site.
This requirement sits under the Pillar 2 Construction Professional Services framework and covers Work Package 2E, which includes detailed architectural, structural, civil, mechanical, electrical, and public health (MEP) design services for all non?CL4 buildings and campus systems.
Under Work Package 2E, the Design Partner will produce technical drawings, BIM models, specifications, engineering designs, and coordinated design deliverables required to progress the main site components of the programme through assurance, gateway reviews, planning stages, procurement, and delivery. This includes designing building layouts, services systems, structural solutions, site infrastructure, utilities connections, and integrating these with the overall campus masterplan.
They will work closely with the Project Delivery Partner (2A), Design Assurance Partner (2C), the H50 Design Partner (2D), and the Tier 1 Contractor to ensure all main site designs are fully coordinated, compliant, buildable, and technically integrated with the specialist facilities. The 2E Design Partner will also support technical reviews, respond to design changes, and provide design updates throughout remobilisation and full delivery.
Overall, the Design Partner will ensure that the wider Health Security Campus is designed to modern scientific, operational, safety, and regulatory standards, providing the essential design capability required for successful programme delivery.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 22 May 2026 | Pipeline notice (UK1) | Procurement Act 2023 | 048299-2026 |
| 1 Jun 2026 | Pipeline notice (UK1) | Procurement Act 2023 | 051212-2026 |
more from Secretary of State for Health and Social Care acting as part of the Crown through UK Health Security Agency
- Vitrocell Exposure System · £99,964 · 28 Jul 2026
- Card Payment Solution (2026 - 2029) · £105,000 · 23 Jul 2026
- Microbiological Safety Cabinet (Porton Down) · £12,488 · 23 Jul 2026
- NW Manchester Telepath LIMS annual support · £121,321 · 23 Jul 2026
- Porton Industrial Automated Control System Works · £1,950,000 · 22 Jul 2026
- Women in Leadership Training for AIA Directorate · 21 Jul 2026
- Provision for Membership to The Global Health Network (Global Health Protection · 20 Jul 2026
- Provision of Haematology Analysers for CDEP · 16 Jul 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Award of Direct Award-26CP027-QEUH-QEUH Emergency Department Redesign-Lead Consultant · NHS Greater Glasgow and Clyde · £19,942
- Oxford - Architect Services · NETWORK RAIL INFRASTRUCTURE LIMITED · £1,900,000
- New Museum Project - Deep Time Gallery: Exhibition Lead Designer · London Museum · £300,000
- Design Lead for Linwood School Satellite Expansion · Bournemouth, Christchurch and Poole Council · £300,000
- Sleep Studies and LTV - Design · Chelsea and Westminster Hospital NHS Foundation Trust
- Mechanical and Electrical Services Stage 4 Design in relation to Theatre 5 and Theatre 6 located on Level 5 at Chelsea and Westminster Hospital. · Chelsea and Westminster Hospital NHS Foundation Trust · £150,156
- Wawne Road Hull - EA · THIRTEEN HOUSING GROUP LIMITED · £51,870
- Gamma Camera - Architect · Guy's and St Thomas' NHS Foundation Trust · £42,209
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.