Barbican Residential Estate - Lift Refurbishment Project – Lift Consultants,

key details

Value£300,000 (£360,000 inc. VAT)
Statusactive
Category (CPV) 42416100 +2 more
RegionLondon
Procedureselective
OCIDocds-h6vhtk-066b79

description

General Description of Works for Which Services are Required

The City of London Corporation (CoLC) proposes to complete a major modernisation (or replacement if deemed appropriate) for the 9No. lifts within Cromwell Tower, Lauderdale Tower, and Shakespeare Tower. The successful consultant is to survey the existing lifts to determine how the existing lifts are to be either modernised or replaced to reach the standards set by the Corporation and ensure they meet the conditions of any required Statutory Consents.

The current lifts are bespoke, with many parts specified closed protocol. The intention is to modernise/replace the lifts with parts available via open protocol, to mitigate limitations around supply for maintenance purposes during the serviceable life of the lifts post-completion.

Lift Asset Overview Reports have highlighted the current lifts are towards the end of their serviceable life, with the general condition noted as obsolete and requiring attention. Therefore, it is recommended a project to modernise/replace the lifts is considered now. It is noted within the survey reports that the existing guides, counterweight, lift car, and hoist motor remain in a reusable condition. We would still expect the appointed lift consultant to complete their own surveys and provide with own professional opinion on the level of lift modernisation/replacement required.

Resident Engagement

CoLC require the Lift Consultant’s assistance during tenant discussions and fit out design throughout RIBA Stages 0-6. Production of design information and overview of the proposals, going through to updates on works during construction.

RIBA Stage 0 & 1

CoLC will instruct the Lift Consultant to complete initial site surveys and feasibility study to determine the preferred option for lift modernisation/replacement. Feasibility to include anticipated timescales and costs.

RIBA Stage 2 & 3

Following feedback from stakeholders and a decision for the preferred option, Lift Consultant will be required to then develop the design to complete RIBA Stage 2/3. As Project Manager, the Lift Consultant will need to ensure the designs are coordinated with all relevant statutory approvers such as Building Regulations and Heritage.

They will also be expected to work with the CoLC in any procurement activities required for the Main Construction works.

RIBA Stage 4

The Lift Consultant is to produce a full technical specification and contractual documentations for competitive tender purposes. Consultant to allow for review and feedback on drafted documentation, completing all necessary alterations.

Consultant to lead the tender processes (with assistance from CoLC, including CoLC Procurement), undertaking a full tender analysis. To allow for tender interviews with contractors.

Consultant will be expected to provide suitable input to facilitate instructing the nominated contractor, to include reviewing any necessary appointment documents which may include a letter of intent.

RIBA Stage 5

The Consultant is appointed at Stage 5 for the purposes of management of the project including but not limited to monitoring progress, reviewing Contractor’s Proposals, inspecting the quality of manufacture and construction of the Project, chairing contractor meetings, reviewing payment applications, variation instructions and the like, and witnessing any test and advising whether the same comply with the performance requirements and design of the Project and the Client Brief.

The Consultant shall provide suitably qualified staff to visit the site at appropriate intervals to inspect the Works and carry out the services.

RIBA Stage 6 & 7

The Consultant is to assist CoLC in the handover process, reviewing and commenting on completion documents issued by the Contractor, review and ensure all defects are closed out (issuing all relevant certificates), and provide full support during the warranty period and defect liability period as required.

Principal Designer

Throughout the project cycle, the Lift Consultant will also be expected to undertake the role of Principal Designer (CDM). A separate consultant will be appointed for the role of Principal Designer (BR), however the Lift Consultant is expected to assist this appointed consultant in their duties.

General Considerations

The lifts should be modernised/replaced subject to any necessary requirements of the Local Planning Authority and Listed Building Consent, but with improved specifications to meet the current Building Regulations. The Design Team in which this document is intended to procure, shall be named as ‘Consultant’ throughout this brief.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
16 Mar 2026 Tender notice (UK4) Procurement Act 2023 023707-2026

more from The Mayor and Commonalty and Citizens of the City of London

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.