Milford Hospital Boiler Room and Heating Distribution Replacement Works

NHS Property Services Limited Published 7 Jan 2026 Find a Tender

key details

Statuscomplete
Procedurelimited
OCIDocds-h6vhtk-060097

Award

SupplierValueDateStatus
MJG Mechanical Services Ltd · · active

description

The hospital's heating infrastructure comprises two plant rooms: the north room with two 75kW gas boilers serving the X-ray block, and the south room with two 175kW boilers supporting both radiators and air handling units (AHUs). LEDA’s thermal modelling determined a total heating load of around 354kW, prompting a proposed upgrade to 450kW using three 150kW Hamworthy modular boilers. This upgrade will also include new heating and LTHW pumps, a pressurisation unit, expansion vessel, dosing ports, shunt pumps, and a gas safety system, while retaining the existing gas-fired calorifier.

The current below-ground pipework serving radiators in both blocks will be replaced by a new system routed through loft areas, with local drops to individual radiators. These radiators will be LST type, each fitted with Danfoss dynamic valves and remote temperature sensors for independent control, eliminating the need for zone valves. Bypass valves will be installed at end-line pipes to ensure minimum flow, and radiant panels will be added to ward areas with grid ceilings and corridors. Pipework drops will be enclosed using Pendock boxing, as detailed in the mechanical services drawings.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
7 Jan 2026 Contract details (UK7) Procurement Act 2023 000910-2026

more from NHS Property Services Limited

all contracts from this buyer →

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.