Disabled Toilets Works
key details
| Status | complete |
|---|---|
| OCID | ocds-h6vhtk-05d96a |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Internal Projects Limited | · | · | active |
description
The works include the reconstruction of two unisex toilets and one disabled toilet facility on the first floor of Block E, incorporating all required demolition, construction, plumbing, joinery, finishes, and installation of sanitary fittings to provide fully functional and compliant facilities.
- Demolition and Strip-Out
| • | Cut out new doorway, including all necessary brickwork alterations. |
| • | Remove existing fire door and frame. |
| • | Remove 5 No. existing doors and frames. |
| • | Block up 2 No. existing door openings using materials that match existing structure. |
| • | Demolish internal walls as required to accommodate new layout. |
| • | Complete soft strip works, removing all redundant fittings, pipework, and finishes. |
- Builder's Work
| • | Construct new internal partition walls in accordance with the approved layout and specification. |
| • | Install new suspended or plasterboard ceilings as required. |
| • | Provide boxing-in to conceal new pipework and services. |
| • | Form shelving and provide cover to conceal and protect the water heater. |
- 4.Joinery
- Install 3 No. new doors and frames, complete with ironmongery and furniture.
- 5.Plumbing and Sanitary Installations
| • | Supply and install a 30 Litre Water Heater to serve all new sanitary appliances. |
| • | Install 2 No. unisex toilet sets, each to include: |
| o | WC pan, cistern, and seat. |
| o | Basin with thermostatic mixer taps. |
| • | Install 1 No. Doc M Pack Toilet Facility, including: |
| o | Doc M compliant WC, basin, grab rails, and fittings in accordance with Building Regulations Part M. |
| • | Connect all sanitary fittings to existing water and waste systems. |
| • | Test and commission all plumbing systems upon completion. |
- Finishes
| • | Make good all disturbed walls, windows, and ceilings following construction and installation works. |
| • | Prepare and decorate all new and existing surfaces throughout using a high-quality, washable paint system suitable for wet areas. |
________________________________________
- Compliance and Handover
| • | Ensure all works comply with: |
| o | Building Regulations Part M (Access to and Use of Buildings). |
| o | BS 8300 (Design for Accessibility). |
| o | Relevant fire and water safety regulations. |
| • | Provide all test certificates, warranties, and as-built documentation upon completion. |
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 4 Nov 2025 | Contract details (UK7) | Procurement Act 2023 | 070654-2025 |
more from North East London NHS Foundation Trust
- Splashtop Enterprise Support Licences · 17 Jul 2026
- Sofas for Ward · 10 Jul 2026
- Roof Replacement · 10 Jul 2026
- NELFT - Outsourced Clinical Transcription RFI · 3 Jun 2026
- NELFT Voluntary & Community Sector (VCS) Peer Worker Provision · £664,000 · 29 May 2026
- Medical Couches · 29 May 2026
- Fire Doors · 29 May 2026
- Recruitment · 22 May 2026
all contracts from this buyer →
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.