gvtcx

Cable Management System- Shore to Ship Power, Oban Base

Northern Lighthouse Board Published 12 Sept 2025 Find a Tender

key details

Value£600,000 (£720,000 inc. VAT)
Statusplanning
Category (CPV) 34930000 +2 more
OCIDocds-h6vhtk-059936

description

Historically, vessels at Oban Base have relied solely on onboard diesel generators while berthed, leading to continued fuel use and associated emissions. There has been no shore power provision in place.

The procurement of a cable management system is a strategic requirement, aligned with NLB’s long-term sustainability objectives and operational shift toward cleaner technologies. It is driven by the introduction of NLV Pole Star, a new hybrid-powered vessel constructed by Gondán Shipbuilders in Spain. Pole Star features state-of-the-art hybrid systems designed to significantly reduce environmental impact. To fully realise its capabilities, the vessel requires a compatible shore power connection when alongside.

At this stage, we expect the contract scope to cover the supply, delivery, installation support, commissioning, and maintenance of a shore-to-ship cable management system at Oban Base, however this is to be confirmed. This includes all associated equipment, software (if applicable), training for NLB and vessel crews, and ongoing support services.

We are inviting expressions of interest from suppliers who can provide mobile cable management systems that meet the key operational, technical, and environmental requirements of the Shore to Ship Project at Oban Base. The selected solution should adhere to the following essential project constraints:

Flexibility and Mobility: The system must be fully mobile, allowing for easy deployment and removal, with minimal impact on the base's operations when not in use.

Compatibility with Tidal Movements: The solution must be capable of operating effectively across the full tidal range at Oban Base, with the ability to accommodate fluctuations in water level while maintaining safe and stable cable connections.

Safety and Compliance: The system must comply with relevant safety standards, including IEC PAS 80005-3, ensuring safe operation during cable connection and disconnection processes. The design should incorporate features that prevent damage to cables and ensure the integrity of the connection under dynamic marine conditions.

Minimal Infrastructure Impact: The solution should require minimal or no modifications to existing infrastructure at Oban Base, particularly avoiding the need for significant deck strengthening or large-scale civil works.

Environmental Suitability: The system must be able to withstand harsh marine environments, with corrosion-resistant materials and the ability to operate effectively in a range of weather and sea conditions.

Operational Simplicity: The system should be user-friendly, requiring minimal training for both shore and ship personnel. It should also involve straightforward maintenance procedures to ensure long-term reliability and ease of operation.

We invite suppliers who can meet these criteria to engage with us. Please contact us to express your interest and to discuss how your solution can support the successful delivery of this important project.

For more information about this opportunity, please visit the Delta eSourcing portal at:

https://nlb.delta-esourcing.com/tenders/UK-UK-Edinburgh:-Marine-equipment./A3UXK468NS

To respond to this opportunity, please click here:

https://nlb.delta-esourcing.com/respond/A3UXK468NS

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
12 Sept 2025 Preliminary market engagement (UK2) Procurement Act 2023 056101-2025

more from Northern Lighthouse Board

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.