gvtcx

Mine Water Treatment Scheme (MWTS) - Panel Relocation

Mining Remediation Authority Published 21 Aug 2025 Find a Tender

key details

Statuscomplete
RegionNorth East
Proceduredirect
SME suitableYes
OCIDocds-h6vhtk-058bdb

Award

SupplierValueDateStatus
AR Power £33,086 · pending

description

The Mining Remediation Authority have two Mine Water Treatment Scheme (MWTS) sites with solar PV installed that have missing or damaged solar panels. The sites are Dawdon MWTS and Bates MWTS. Both of these sites share the same 270w solar panels, in terms of manufacturer and model number.

We would like to relocate missing panels from Dawdon MWTS with panels located at Bates MWTS.

Sourcing rationale

A total of four quotes were requested and three were received from local SMEs. A comparison matrix was compiled, assessing cost, capacity, and overall suitability to determine the best fit supplier. This approach was selected over a full tender process as the contract value falls below the relevant threshold, allowing a more proportionate and efficient procedure

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
21 Aug 2025 Transparency notice (UK5) Procurement Act 2023 050416-2025

more from Mining Remediation Authority

all contracts from this buyer →

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.